A Platform to access your 4castplus data from any BI tool

The six tabs in this document specify the detailed data fields available in the Views included with the 4castplus BI Analytics Platform. The fields specified are only the system-provided data fields and do not include any user-defined custom fields. Custom fields are, nevertheless, included in the View and will be visible when you attach to the View from your BI tool.

All Project Details View

All Project Details is a dataset that shows all project transactions of any type. It includes data from all projects over a date range.  Custom properties are not specified but are included.
epBI ViewData TypeDescription

Supplier

/ Contractor

/ Department

BI_ANALYTICS_ALL_PROJECT_DETAILS.

SUPPLIER_CONTRACTOR_DEPARTMENT

TextVendor associated with a Contractor Labor Resource or Invoice, or the Department associated with a non-Contractor Labor Resource.
Department

BI_ANALYTICS_ALL_PROJECT_DETAILS.

DEPARTMENT

TextDepartment Name (for Labor Resources). 

All Vendor Invoice View

All Vendor Invoice is a dataset that shows vendor invoice  transactions from all projects over a date range. 
Custom properties are not specified but are included.
Field Name Data TypeDescription
Division CodeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.DIVISION_CODETextUnique code established for a Division
Payment TermsBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PAYMENT_TERMSTextPayment Terms from Vendor Profile or Purchase Order/Subcontract
Project CodeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PROJECT_CODETextUnique code for the project. 
Project NameBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PROJECT_NAMETextProject Name
Vendor CodeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_CODETextCode from Vendor Profile. 
Vendor Invoice Amount (Pre-tax)BI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_AMOUNT
CurrencyAmount of Vendor Invoice, before Taxes and Holdback.
Vendor Invoice ApproverBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_APPROVER
TextName of individual who last Approved the Vendor Invoice
Vendor Invoice Created ByBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_CREATED_BY
TextName of individual that Created the Vendor Invoice
Vendor Invoice Created On DateBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_CREATED_ON
DateDate that the Vendor Invoice was Created
Vendor Invoice DateBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_DATE
DateDate of the Vendor Invoice entered in Vendor Invoice Matching.
Vendor Invoice Exported ByBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_EXPORTED_BY
TextName of the individual, where Exported in Business Intelligence > Export Documents or “4castplus API” where Exported through an Integration
Vendor Invoice Export Document #BI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOIC
E_EXPORT_DOCUMENT_NUMBER
TextUnique Export # associated with the Item that has been Exported, either through Export Documents in Business Intelligence, or through an integration using the 4castplus API
Vendor Invoice Export DateBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_EXPORT_DATE
DateDate that Item was Exported, either through Export Documents in Business Intelligence, or through an integration using the 4castplus API
Vendor Invoice Internal IDBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_INTERNAL_ID
TextUnique ID used to identify the Vendor Invoice in the database
Vendor Invoice Approval CommentsBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_APPROVAL_COMMENTS
TextComments from the last Approval on the Vendor Invoice
Vendor Invoice NotesBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_NOTES
TextNotes from the Invoice Vendor
Vendor Invoice NumberBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_NUMBER
TextNumber of the Vendor Invoice entered in Vendor Invoice Matching.  This may or may not be the same as the Vendor Document #. 
Vendor Invoice Payment Due DateBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_PAYMENT_DUE_DATE
DateDate that the Payment for Vendor is due, calculated as the Vendor Invoice Date + Payment Terms
Vendor Invoice RetainageBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_RETAIANGE
CurrencyTotal of Retainage applied to Vendor Invoice transactions
Vendor Invoice StatusBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOIC
E_STATUS
TextWorkflow status of the Vendor Invoice: Open, Submitted, Approved
Vendor Invoice Submitted ByBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_SUBMITTED_BY
TextName of the individual that Submitted the Vendor Invoice
Vendor Invoice Submitted On DateBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_SUBMITTED_ON
DateDate that the Vendor Invoice was Submitted
Vendor Invoice TaxesBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOCE
_TAXES
CurrencyTotal of Taxes for Vendor Invoice Transactions 
Vendor Invoice Total (after Retainage)BI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_INVOICE
_TOTAL
CurrencyAmount of Vendor Invoice, including Taxes and Retainage
Vendor NameBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR_NAMETextVendor Name
    
Transaction information   
Accounting CodeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.ACCOUNTING
_CODE
TextAccounting code associated with the invoice transactions
Internal CommentBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.INTERNAL
_COMMENTS
TextComments entered for the Vendor Invoice transaction 
Purchase Order NumberBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PURCHASE
_ORDER_NUMBER
TextPurchase Order or Subcontract Number
Purchase Order Line itemBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PO_LIN
E_NUMBER
TextPO or Subcontract Line Item Number
Purchase Order Line Item DescriptionBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.PO_LINE
_ITEM_DESCRIPTION
TextItem Description for the PO Line Item
Rate TypeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.RATE
_TYPE
TextUnit of measure used in Vendor Invoice transaction (feet, unit, etc.)
ResourceBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.RESOURCE
_NAME
TextName of the Labor, Equipment, Materials, Expenses or Services resource item selected for the Vendor Invoice transaction.
Resource ClassBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.RESOURCE
_CLASS
TextGrouping that the Resource has been created under.  All Resources must belong to a Resource Class.
Resource TypeBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.RESOURCE
_TYPE
TextResource Type (Equipment, Materials, Services or Expenses) of Resource in transaction or estimate
Vendor Document #BI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_DOCUMENT_NUMBER
TextThe Document Number of the Procurement Receipt or Third Party Expense
Vendor Invoice Item AmountBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_INVOICE_ITEM_AMOUNT
CurrencyAmount of Vendor Invoice transactio, excluding Taxes and Retainage
Vendor Invoice Item RetainageBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_INVOICE_ITEM_RETAINAGE
CurrencyAmount of Retainage applied to Vendor Invoice transaction
Vendor Invoice Item NotesBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_INVOICE_ITEM_NOTES
TextNotes from the Vendor Invoice transaction
Vendor Invoice Item QtyBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_INVOICE_ITEM_QTY
DecimalQuantity from the Vendor Invoice transaction
Vendor Invoice Item TaxBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.VENDOR
_INVOICE_ITEM_TAX
CurrencyTaxes for Vendor Invoice Transaction
WBSBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.WBSTextThe hierarchical number applied to the WBS to identify the order of Areas, Phases and Workpackages.
WorkpackageBI_ANALYTICS_VENDOR_INVOICE_TRANSACTIONS.WORKPACKAGETextName of the workpackage that the transaction is recorded on. A Workpackage is the lowest level element of a project’s WBS, and might be referred as a ‘Task’, ‘Code’, ‘Activity’ or ‘WBS item’

 

All Procurement Items View

All Procurement Items is a dataset that shows procurement items specified on purchase orders or subcontracts from all projects over a date range.  Custom properties are not specified but are included.
    
Field Name Data TypeDescription
#Items DecimalQuantity of the Purchase Order or Subcontract Line Item 
Accounting Code TextAccounting code associated with the invoice transactions
Bid Closing Date (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.BID_CLOSING
_DATE_ACTUAL
DateActual Date that the RFQ was Closed on
Bid Closing Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.BID_CLOSING
_DATE_FORECAST
DateForecasted Date that the RFQ is expected to be Closed on
Bid Closing Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.BID_CLOSING
_DATE_SCHEDULED
DateScheduled Date that the RFQ is expected to be Closed on
Bid Extension DateBI_ANALYTICS_PROCUREMENT_ITEMS.BID_EXTENSION
_DATE
DateDate that the RFQ has been extended to
Bid Recommendation Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.BID_
RECOMMENDATION_SCHEDULED
DateScheduled Date that the RFQ Bid Recommendation is expected to be compelted on
BuyerBI_ANALYTICS_PROCUREMENT_ITEMS.BUYERTextLabor Resource assigned to the Buyer Role in the Requisition or Purchase Order or Subcontract
Buyer CommentsBI_ANALYTICS_PROCUREMENT_ITEMS.BUYER_
COMMENTS
TextComments from the Buyer for the Purchase Order or Subcontract
Closed DateBI_ANALYTICS_PROCUREMENT_ITEMS.CLOSED_
DATE
DateDate that the Purchase Order or Subcontract was Closed on
Committed PO CostBI_ANALYTICS_PROCUREMENT_ITEMS.COMMITTED
_PO_COST
CurrencyCost that has been Committed for the Purchase Order or Subcontract Line Item
Committed PO QtyBI_ANALYTICS_PROCUREMENT_ITEMS.COMMITTED
_PO_QTY
DecimalQuantity that has been Committed for the Purchase Order or Subcontract Line Item
Committed PO RevenueBI_ANALYTICS_PROCUREMENT_ITEMS.COMMITTED
_REVENUE
CurrencyRevenue that has been Committed for the Purchase Order or Subcontract Line Item
Committed PO Unit CostBI_ANALYTICS_PROCUREMENT_ITEMS.COMMITTED
_PO_UNIT_COST
CurrencyUnit Cost of the Purchase Order or Subcontract Line Item
Committed PO Unit PriceBI_ANALYTICS_PROCUREMENT_ITEMS.COMMITTED
_PO_UNIT_PRICE
CurrencyUnit Price of the Purchase Order or Subcontract Line Item
Construction Workpackage TextSystem field provided to allow users to identify a subset of the project scope that a Procurement Line Item relates to. Often referred to as CWP
Cost CodeBI_ANALYTICS_PROCUREMENT_ITEMS.COST_CODETextCost Code selected from the Project CBS 
CurrencyBI_ANALYTICS_PROCUREMENT_ITEMS.CURRENCYTextCurrency of the Purchase Order or Subcontract
Databooks SubmittedBI_ANALYTICS_PROCUREMENT_ITEMS.DATA_BOOKS
_SUBMITTED
DateDate that the Databooks were Submitted for the Purchase Order or Subcontract Line Item
EngineerBI_ANALYTICS_PROCUREMENT_ITEMS.ENGINEERTextLabor Resource selected for the Engineer Role in the Requisition 
Estimate Item IDBI_ANALYTICS_PROCUREMENT_ITEMS.ESTIMATE_ITEM
_ID
TextSystem ID applied to Item When Estimate Item Auto-numbering enabled
Estimated Arrival (Actual) DateActual date that Purchase Order or Subcontract Line Item Arrived
Estimated Arrival (Forecasted) DateScheduled date that Purchase Order or Subcontract Line Item Arrived
Estimated Arrival (Scheduled) DateForecasted date that Purchase Order or Subcontract Line Item Arrived
Estimated Travel Time Integer# of Days in Travel Time; used to calculate Estimated Arrival Dates
Expedite?BI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITEBooleanSystem field to indicate if Purchase Order or Subcontract Line Item is to be Expedited
Expediting – Inspection RequiredBI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITING
_INSPECTION_REQUIRED
BooleanIndicates if Inspection is Required, when Expediting
Expediting – Ship To DestinationBI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITING
_SHIP_TO_DESTINATION
TextShip To Destination for Purchase Order or Subcontract Line Item, from Expediting
Expediting CommentsBI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITING
_COMMENTS
TextComments applied to the Purchase Order or Subcontract Line Item, from Expediting
Expediting NotesBI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITING
_NOTES
TextNotes entered for the Purchase Order or Subcontract Line Item, from Expediting
ExpeditorBI_ANALYTICS_PROCUREMENT_ITEMS.EXPEDITORTextLabor Resource selected for the Expeditor role in the Purchase Order or Subcontract
Fabrication Completion (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_COMPLETION_ACTUAL
DateActual Date that Fabrication was completed
Fabrication Completion (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_COMPLETION_SCHEDULED
DateScheduled Date that Fabrication is to be completed
Fabrication Completion Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_COMPLETION_FORECASTED
DateForecasted Date that Fabrication is to be completed
Fabrication Scheduled Receive DateBI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_SCHEDULED_RECEIVED_DATE
DateScheduled Date that Fabrication is to be received
Fabrication Start Date (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_START_DATE_ACTUAL
DateActual Date that Fabrication was started
Fabrication Start Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_START_DATE_FORECASTED
DateForecasted Date that Fabrication was started
Fabrication Start Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.FABRICATION
_START_DATE_SCHEDULED
DateScheduled Date that Fabrication was started
Heavy LiftBI_ANALYTICS_PROCUREMENT_ITEMS.HEAVYLIFTBooleanIndicates if heavy lift equipment is needed for physical receiving of Purchase Order or Subcontract Line Item
Incurred AmountBI_ANALYTICS_PROCUREMENT_ITEMS.INCURRED
_AMOUNT
CurrencyAmount of Purchase Order or Subcontract Line Item that has been recorded as Actual Cost.  Includes Adjustments from Vendor Invoice Matching, and Purchase Order Close Adjustments
Incurred QtyBI_ANALYTICS_PROCUREMENT_
ITEMS.INCURRED_QTY
DecimalQuantity of Purchase Order or Subcontract Line Item that has been recorded as Received.  Includes Adjustments from Vendor Invoice Matching, and Purchase Order Close Adjustments
Incurred RateBI_ANALYTICS_PROCUREMENT_
ITEMS.INCURRED_RATE
CurrencyIncurred Amount / Incurred Qty
Initial Document Due Date (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.INITIAL
_DOCUMENT_DUE_DATE_ACTUAL
DateActual Date that Initial Document is Due
Initial Document Due Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.INITIAL
_DOCUMENT_DUE_DATE_FORECASTED
DateForecasted Date that Initial Document is Due
Initial Document Due Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.INITIAL
_DOCUMENT_DUE_DATE_SCHEDULED
DateScheduled Date that Initial Document is Due
Inspection CompleteBI_ANALYTICS_PROCUREMENT_ITEMS.INSPECTION
_COMPLETE
BooleanIndicates if Inspection is complete
Inspection Level TextInspection Level required for Purchase Order or Subcontract Line Item
Inspection RequiredBI_ANALYTICS_PROCUREMENT_ITEMS.INSPECTION
_REQUIRED
BooleanIndicates if Inspection is required  
Invoice AmountBI_ANALYTICS_PROCUREMENT_ITEMS.INVOICE
_AMOUNT
CurrencyAmount of Vendor Invoice, before Taxes and Holdback.
Invoice QtyBI_ANALYTICS_PROCUREMENT_ITEMS.INVOICE_QTYDecimalQuantity of Vendor Invoice
Invoice RateBI_ANALYTICS_PROCUREMENT_ITEMS.INVOICE_RATECurrencyInvoice Amount / Invoice Qty
Item Date DateDate of Purchase Order or Subcontract Line Item
Item DescriptionBI_ANALYTICS_PROCUREMENT_ITEMS.ITEM
_DESCRIPTION
TextDescription of Purchase Order or Subcontract Line Item
Item Revision DateBI_ANALYTICS_PROCUREMENT_ITEMS.ITEM
_REVISION_DATE
DateDate that Purchase Order or Subcontract Line Item was Revised
Kickoff Meeting DateBI_ANALYTICS_PROCUREMENT_ITEMS.KICKOFF_MEETING
_DATE
DateDate of Kickoff Meeting 
Last Committed PO Revision NumberBI_ANALYTICS_PROCUREMENT_ITEMS.LAST_COMMITTED
_PO_REV_NUM
TextPurchase Order Revision Number from the Last Committed Revision of the Purchase Order or Subcontract
Last Contact DateBI_ANALYTICS_PROCUREMENT_ITEMS.LAST_CONTACT
_DATE
DateLast date of contact with Vendor or Subcontractor
Level of ExpeditingBI_ANALYTICS_PROCUREMENT_ITEMS.LEVE
L_OF_EXPEDITING
TextLevel of Expediting selected for the Purchase Order or Subcontract Line item
Major Material Ordered Date (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_ORDERED_DATE_ACTUAL
DateActual date that Materials were ordered for the Purchase Order or Subcontract Line Item
Major Material Ordered Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_ORDERED_DATE_FORECASTED
DateForecasted date that Materials were ordered for the Purchase Order or Subcontract Line Item
Major Material Ordered Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_ORDERED_DATE_SCHEDULED
DateScheduled date that Materials were ordered for the Purchase Order or Subcontract Line Item
Major Material Received Date (Actual)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_RECEIVED_DATE_ACTUAL
DateActual date that Materials were received for the Purchase Order or Subcontract Line Item
Major Material Received Date (Forecasted)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_RECEIVED_DATE_FORECASTED
DateForecasted date that Materials were received for the Purchase Order or Subcontract Line Item
Major Material Received Date (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.MAJOR_MATERIAL
_RECEIVED_DATE_SCHEDULED
DateScheduled date that Materials were received for the Purchase Order or Subcontract Line Item
Next Contact DateBI_ANALYTICS_PROCUREMENT_ITEMS.NEXT_CONTACT
_DATE
DateNext contact date planned for the Vendor or Subcontractor
NotesBI_ANALYTICS_PROCUREMENT_ITEMS.NOTESTextNotes entered for the Purchase Order or Subcontract Line Item, from the Purchase Order or Subcontract
Open PO QtyBI_ANALYTICS_PROCUREMENT_ITEMS.OPEN_PO_QTYDecimalQuantity of the Purchase Order or Subcontract Line Item, when Open or In Revising
O&SBI_ANALYTICS_PROCUREMENT_ITEMS.OS_AND_DBooleanIndicates if Purchase Order or Subcontract Line Item as Over-shipped, Short-shipped or Damaged issue
OS&D ResolvedBI_ANALYTICS_PROCUREMENT_ITEMS.OS_AND_D
_RESOLVED
DateDate that Over-shipped, Short-shipped or Damaged issue resolved for Purchase Order or Subcontract Line Item
OverageBI_ANALYTICS_PROCUREMENT_ITEMS.OVERAGECurrencyValue of Receipts in excess of the Purchase Order or Subcontract Commitment
PO #BI_ANALYTICS_PROCUREMENT_ITEMS.PURCHASE
_ORDER_NUMBER
TextPurchase Order Number
PO Acknowledgement DateBI_ANALYTICS_PROCUREMENT_ITEMS.
ACKNOWLEDGEMENT_DUE_DATE
DateDate that receipt of the Purchase Order or Subcontract was acknowledged by the Vendor
PO Amount (Base CCY)BI_ANALYTICS_PROCUREMENT_ITEMS.PO_AMOUNT
_BASE_CCY
CurrencyPurchase Order or Subcontract Amount, in the Project Currency
PO Amount (PO CCY)BI_ANALYTICS_PROCUREMENT_ITEMS.PO_AMOUNT
_PO_CCY
CurrencyPurchase Order or Subcontract Amount, in the Purchase Order Currency
PO Close AdjustmentBI_ANALYTICS_PROCUREMENT_ITEMS.PO_CLOSE
_ADJUSTMENT
CurrencyCalculation applied when the Incurred Cost on the Purchase Order or Subcontract is less than the Commitment Cost, when Closed
PO Commitment (Net)BI_ANALYTICS_PROCUREMENT_ITEMS.PO
_COMMITMENT_NET
CurrencyPurchase Order or Subcontract Committed Cost less PO Close Adjustment
PO Date TransmittedBI_ANALYTICS_PROCUREMENT_ITEMS.DATE
_TRANSMITTED
DateDate that Purchase Order or Subcontract was sent to the Vendor
PO Issue (Scheduled)BI_ANALYTICS_PROCUREMENT_ITEMS.PO
_ISSUE_SCHEDULED
DateScheduled Date that the Purchase Order or Subcontract is to be Issued by
PO Issued ByBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_ISSUED_BY
TextEntity issuing Purchase Order or Subcontract:  Company, Customer or Division
PO Issued By NameBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_ISSUED_BY_NAME
TextName of Entity issuing Purchase Order or Subcontract
PO Line #BI_ANALYTICS_PROCUREMENT_ITEMS.PO
_LINE_NUMBER
IntegerLine # of the Purchase Order or Subcontract Item
PO Line Item Revision NumberBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_LINE_ITEM_REVISION_NUMBER
IntegerRevision Number of the Purchase Order or Subcontract Line Item, from the last Committed Revision
PO Progress StatusBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_PROGRESS_STATUS
TextWorkflow Status of the Purchase Order or Subcontract: Open, Committed, In Revising, Closed, Cancelled
PO Rate (Base CCY)BI_ANALYTICS_PROCUREMENT_ITEMS.PO
_RATE_BASE_CCY
CurrencyPurchase Order or Subcontract Line Item Commitment Cost / Quantity, in the Project Currency
PO Rate (PO CCY)BI_ANALYTICS_PROCUREMENT_ITEMS.PO
_RATE_PO_CCY
CurrencyPurchase Order or Subcontract Line Item Commitment Cost / Quantity, in the Purchase Order Currency
PO Responsible EngineerBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_RESPONSIBLE_ENGINEER
TextLabor Resource selected for role in Purchase Order or Subcontract
PO Revision NumberBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_REVISION_NUMBER
TextRevision Number of the Purchase Order or Subcontract from the last Committed Revision
PO StatusBI_ANALYTICS_PROCUREMENT_ITEMS.PO
_STATUS
TextApproval status of the Purchase Order or Subcontract: Pending, Approved, Rejected, Dead-locked
Procurement ActionBI_ANALYTICS_PROCUREMENT
_ITEMS.PROCUREMENT_ACTION
TextNotes from Requisition, to provide additional details for Procurement
Project CodeBI_ANALYTICS_PROCUREMENT
_ITEMS.PROJECT_CODE
TextUnique code for the project. 
Project NameBI_ANALYTICS_PROCUREMENT
_ITEMS.PROJECT_NAME
TextProject Name.
Purchase Order TitleBI_ANALYTICS_PROCUREMENT
_ITEMS.PO_TITLE
TextTitle of Purchase Order or Subcontract
Qty Remaining To DateBI_ANALYTICS_PROCUREMENT
_ITEMS.QTY_REMAINING
DecimalQuantity of the Purchase Order or Subcontract Line Item, less Received Qty to date
Rate TypeBI_ANALYTICS_PROCUREMENT
_ITEMS.RATE_TYPE
TextUnit of measure selected in Purchase Order or Subcontract Line Item
Received AtBI_ANALYTICS_PROCUREMENT
_ITEMS.RECEIVED_AT
TextLocation that Purchase Order or Subcontract Line Item was received at
Received QtyBI_ANALYTICS_PROCUREMENT
_ITEMS.RECEIVED_QTY
DecimalQuantity Received of the Purchase Order or Subcontract Line Item
Required At Site (Actual)BI_ANALYTICS_PROCUREMENT
_ITEMS.REQUIRED_AT_SITE_DATE_ACTUAL
DateActual Date that Purchase Order or Subcontract Line Item is required to be Received
Required At Site (Forecasted)BI_ANALYTICS_PROCUREMENT
_ITEMS.REQUIRED_AT_SITE_DATE_FORECASTED
DateForecasted that Purchase Order or Subcontract Line Item is required to be Received
Required At Site (Planned)BI_ANALYTICS_PROCUREMENT
_ITEMS.REQUIRED_AT_SITE_PLANNED
DatePlanned Date that Purchase Order or Subcontract Line Item is required to be Received, from Purchase Requisitions
Required At Site (Scheduled)BI_ANALYTICS_PROCUREMENT
_ITEMS.REQUIRED_AT_SITE_DATE_SCHEDULED
DateScheduled Date that Purchase Order or Subcontract Line Item is required to be Received
Requisition #BI_ANALYTICS_PROCUREMENT
_ITEMS.REQUISITION_NUMBER
TextPurchase Requisition Number
Requisition DateBI_ANALYTICS_PROCUREMENT
_ITEMS.REQUISITION_DATE
DatePurchase Requisition Date
Requisition QtyBI_ANALYTICS_PROCUREMENT
_ITEMS.QUANTITY
DecimalPurchase Requisition Quantity
Requisition Total AmountBI_ANALYTICS_PROCUREMENT
_ITEMS.REQUISITION_TOTAL_AMOUNT
CurrencyPurchase Requisition Total Cost
Requisition Unit CostBI_ANALYTICS_PROCUREMENT
_ITEMS.REQUISITION_UNIT_COST
CurrencyPurchase Requisition Unit Cost
Resource ClassBI_ANALYTICS_PROCUREMENT
_ITEMS.RESOURCE_CLASS
TextGrouping that the Resource has been created under.  
Resource Class CategoryBI_ANALYTICS_PROCUREMENT
_ITEMS.RESOURCE_CLASS_CATEGORY
TextGrouping that the Resource Class has been created under.  
Resource Code TextCode associated with the Resource, from the Resource profile
Resource NameBI_ANALYTICS_PROCUREMENT
_ITEMS.RESOURCE_NAME
TextName of the Resource selected for the Line Item
Resource TypeBI_ANALYTICS_PROCUREMENT
_ITEMS.RESOURCE_TYPE
TextResource Type (Equipment, Materials, Services or Expenses) of Resource in transaction or estimate
RFQ #BI_ANALYTICS_PROCUREMENT
_ITEMS.RFQ_NUMBER
TextRequest for Quote (RFQ) Number
RFQ Issue Date (Actual)BI_ANALYTICS_PROCUREMENT
_ITEMS.RFQ_ISSUE_DATE_ACTUAL
DateActual Date that the RFQ was Issued
RFQ Issue Date (Forecasted)BI_ANALYTICS_PROCUREMENT
_ITEMS.RFQ_ISSUE_DATE_FORECASTED
DateForecasted Date that the RFQ is to be Issued on
RFQ Issue Date (Scheduled)BI_ANALYTICS_PROCUREMENT
_ITEMS.RFQ_ISSUE_DATE_SCHEDULED
DateScheduled Date that the RFQ is to be issued on
Ship Date (Actual)BI_ANALYTICS_PROCUREMENT
_ITEMS.SHIP_DATE_ACTUAL
DateActual Date that the Purchase Order or Subcontract Line Item was shipped on
Ship Date (Forecasted)BI_ANALYTICS_PROCUREMENT
_ITEMS.SHIP_DATE_FORECASTED
DateForecasted Date that the Purchase Order or Subcontract Line Item was shipped on
Ship Date (Scheduled)BI_ANALYTICS_PROCUREMENT
_ITEMS.SHIP_DATE_SCHEDULED
DateScheduled Date that the Purchase Order or Subcontract Line Item was shipped on
Ship to DestinationBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIPT_TO_DESTINATION_NAME
TextDestination that the Purchase Order or Subcontract Line item is to be shipped to
Ship ViaBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIP_VIA
TextMode of transport that the Purchase Order or Subcontract Line Item is to be shipped by
Shipment To Be Stored AtBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIPMENT_TOBE_STORED_AT
TextLocation that the Purchase Order or Subcontract Line Item is to be stored at
Shipping PointBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIPPING_POINT
TextPoint in the shipping process under which the buyer and seller have agreed that ownership and liability transfers to the buyer i.e. FOB
Shipping Release NumberBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIPPING_RELEASE_NUMBER
TextNumber from Release Document that evidences Items have been received
Shipping TermsBI_ANALYTICS_PROCUREMENT
_ITEMS.SHIPPING_TERMS
TextVarious contract terms that govern the shipping costs, insurance, mode of transport, packaging requirements, transfer of liability, etc.
Tag NumberBI_ANALYTICS_PROCUREMENT
_ITEMS.TAG_NUMBER
TextTag Number entered from a Procurement Item
AccrualBI_ANALYTICS_PROCUREMENT
_ITEMS.ACCRUAL
CurrencyActual Costs from Receipts related to Vendors, less Holdback and Invoiced Costs
PO TypeBI_ANALYTICS_PROCUREMENT
_ITEMS.PO_TYPE
TextPurchase Order or Subcontract
Vendor CodeBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_CODE
TextCode from Vendor Profile. 
Vendor Detailed Item DescriptionBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_DETAILED_ITEM_DESCRIPTION
TextDetailed description of Purchase Order or Subcontract Line Item
Vendor Drawing Due DateBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_DRAWING_DUE_DATE
DateDate that Vendor Drawings for the Purchase Order or Subcontract are Due
Vendor Item DescriptionBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_ITEM_DESCRIPTION
TextDescription of Purchase Order or Subcontract Line Item
Vendor NameBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_NAME
TextVendor Name
Vendor QuantityBI_ANALYTICS_PROCUREMENT
_ITEMS.VENDOR_QUANTITY
DecimalQuantity of the Purchase Order or Subcontract Line Item, from RFQ
WbsBI_ANALYTICS_PROCUREMENT
_ITEMS.WBS
TextThe hierarchical number applied to the WBS to identify the order of Areas, Phases and Workpackages.
WorkpackageBI_ANALYTICS_PROCUREMENT
_ITEMS.WORKPACKAGE
TextName of the workpackage that the transaction is recorded on. A Workpackage is the lowest level element of a project’s WBS, and might be referred as a ‘Task’, ‘Code’, ‘Activity’ or ‘WBS item’

Estimate Items View

Estimate Items View is a dataset that shows all estimate items of any type (resource level estimates, workpackage level estimates) for all estimates (baseline revisions, change orders). It includes data from all projects over a date range
UI Field NameBI ViewData TypeDescription
Cost CodeRESOURCE_ESTIMATE_COST_CODEText 
Effective DateBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE_
DATED_VIEW.EFFECTIVE_DATE
DateThe effective date of the estimate item (initial baseline items are dated as 1900-01-01). Otherwise it’s the change order date for change order items and the revision date for baseline revision items.
Is Initial BaselineBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.IS_INITIAL_BASELINE
BooleanDid this estimate item originate from an initial baseline estimate?
Is Baseline RevisionBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.IS_BASELINE_REVISION
BooleanDid this estimate item originate from a baseline revision?
Is Change OrderBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.IS_CHANGE_ORDER
BooleanDid this estimate item originate from a change order?
Is ApprovedBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.IS_APPROVED
BooleanIs this estimate item approved? If the estimate item originate from the initial baseline, this item is considered approved. Otherwise, if the estimate item originates from a baseline revision, the item is considered approved when the baseline revision has been committed. And likewise, if the estimate item originates from a change order, the item is considered approved when the change order has been approved
Total CostBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.TOTAL_COST
CurrencyThe total cost of the estimate item
Total RevenueBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.TOTAL_REVENUE
CurrencyThe total revenue of the estimate item
Total QuantityBI_ANALYTICS_BUDGET_BY_TASK_RESOURCE
_DATED_VIEW.TOTAL_QUANTITY
DecimalThe total quantity of the estimate item. If the estimate item is a task level estimate, the total quantity will include the labor hours. If the estimate item is a resource level estimate, then it will include the quantity 

Budget Resource

Budget Resource is a dataset that shows all Budget Resources of any type (resource level estimates, workpackage level estimates) for all resources (baseline revisions, change orders). It includes data from all projects over a date range
UI Field NameBI ViewData TypeDescription
Cost CodeRESOURCE_ESTIMATE_COST_CODETextThe Cost Code on the Resource Estimate
Resource TypeRESOURCE_TYPE_NAMETextThe Resource Type on the Resource Estimate
Resource NameRESOURCE_NAMETextThe Resource Name on the Resource Estimate
Resource ClassRESOURCE_CLASS_NAMETextThe Resource Class on the Resource Estimate
Rate TypeRATE_TYPE_NAMETextThe Rate Type on the Resource Estimate
Total CostTOTAL_COSTCurrencyThe total cost of the estimate item
Total RevenueTOTAL_REVENUECurrencyThe total revenue of the estimate item
Total QuantityTOTAL_QUANTITYDecimalThe total quantity of the estimate item. If the estimate item is a task level estimate, the total quantity will include the labor hours. If the estimate item is a resource level estimate, then it will include the quantity 

Progress & EV

Budget  Time Phase 

The budget time phase data set shows the day-by-day breakdown of the budget as per the last submitted progress measurement
UI Field NameBI ViewData TypeDescription
Project IdBI_PM_BUDGET_TIME_PHASE.PROJECT_IDIntegerThe id of the Project
Progress Measurement IdBI_PM_BUDGET_TIME_PHASE.PROGRESS_MEASUREMENT_IDIntegerThe id of the last submitted progress measurement
Project Structure IdBI_PM_BUDGET_TIME_PHASE.PROJECT_STRUCTURE_IDIntegerThe id of the workpackage
Work DateBI_PM_BUDGET_TIME_PHASE.WORK_DATEDateThe work date
Resource IdBI_PM_BUDGET_TIME_PHASE.RESOURCE_IDIntegerThe id of the resource
Resource Class IdBI_PM_BUDGET_TIME_PHASE.RESOURCE_CLASS_IDIntegerThe id of the resource class
CostBI_PM_BUDGET_TIME_PHASE.COSTCurrencyThe budgeted cost planned for this work date
RevenueBI_PM_BUDGET_TIME_PHASE.REVENUECurrencyThe budgeted revenue planned for this work date
HoursBI_PM_BUDGET_TIME_PHASE.HOURSDecimalThe budgeted hours planned for this work date
Is BaselineBI_PM_BUDGET_TIME_PHASE.IS_BASELINEBooleanDetermines if this budgeted value is using the baseline time phasing 
Is Current BaselineBI_PM_BUDGET_TIME_PHASE.IS_CURRENT_BASELINEBooleanDetermines if this budgeted value is using the current time phasing 
Is PendingBI_PM_BUDGET_TIME_PHASE.IS_PENDINGBooleanDetermines if this budgeted value originates from a pending change order
Is Approved ChangeBI_PM_BUDGET_TIME_PHASE.IS_APPROVED_CHANGEBooleanDetermines if this budgeted value originates from an approved change order

Actual Time Phase

The actual time phase data set shows the day by day breakdown of the actuals as per the last submitted progress measurement
UI Field NameBI ViewData TypeDescription
Project IdBI_PM_ACTUAL_TIME_PHASE.PROJECT_IDIntegerThe id of the Project
Progress Measurement IdBI_PM_ACTUAL_TIME_PHASE.PROGRESS_
MEASUREMENT_ID
IntegerThe id of the last submitted progress measurement
Project Structure IdBI_PM_ACTUAL_TIME_PHASE.PROJECT_STRUCTURE_IDIntegerThe id of the workpackage
Work DateBI_PM_ACTUAL_TIME_PHASE.WORK_DATEDateThe work date
Resource IdBI_PM_ACTUAL_TIME_PHASE.RESOURCE_IDIntegerThe id of the resource
Resource Class IdBI_PM_ACTUAL_TIME_PHASE.RESOURCE_CLASS_IDIntegerThe id of the resource class
CostBI_PM_ACTUAL_TIME_PHASE.COSTCurrencyThe actual cost amount incurred on this work date
RevenueBI_PM_ACTUAL_TIME_PHASE.REVENUECurrencyThe actual revenue amount incurred on this work date
HoursBI_PM_ACTUAL_TIME_PHASE.HOURSDecimalThe actual hours amount incurred on this work date
Is BaselineBI_PM_ACTUAL_TIME_PHASE.IS_PROCUREMENTBooleanDetermines if this actual amount originates from a procurement related entry

Forecast To Complete Time Phase

The Forecast To Complete time phase data set shows the day by day breakdown of the FTC amounts as per the last submitted progress measurement
UI Field NameBI ViewData TypeDescription
Project IdBI_PM_FTC_TIME_PHASE.PROJECT_IDIntegerThe id of the Project
Progress Measurement IdBI_PM_FTC_TIME_PHASE.PROGRESS_
MEASUREMENT_ID
IntegerThe id of the last submitted progress measurement
Project Structure IdBI_PM_FTC_TIME_PHASE.PROJECT_STRUCTURE_IDIntegerThe id of the workpackage
Work DateBI_PM_FTC_TIME_PHASE.WORK_DATEDateThe work date
Resource IdBI_PM_FTC_TIME_PHASE.RESOURCE_IDIntegerThe id of the resource
Resource Class IdBI_PM_FTC_TIME_PHASE.RESOURCE_CLASS_IDIntegerThe id of the resource class
Forecast To Complete CostBI_PM_FTC_TIME_PHASE.FTC_COSTCurrencyThe forecast to complete cost on this work date
Forecast To Complete RevenueBI_PM_FTC_TIME_PHASE.FTC_REVENUECurrencyThe forecast to complete revenue on this work date
Forecast To Complete HoursBI_PM_FTC_TIME_PHASE.FTC_HOURSDecimalThe forecast to complete hours on this work date

Earned Value Time Phase

The earned value time phase data set shows the day by day breakdown of the earned value as per the last submitted progress measurement
UI Field NameBI ViewData TypeDescription
Project IdBI_PM_EARNED_TIME_PHASE.PROJECT_IDIntegerThe id of the Project
Progress Measurement IdBI_PM_EARNED_TIME_PHASE.PROGRESS_MEASUREMENT_IDIntegerThe id of the last submitted progress measurement
Project Structure IdBI_PM_EARNED_TIME_PHASE.PROJECT_STRUCTURE_IDIntegerThe id of the workpackage
Work DateBI_PM_EARNED_TIME_PHASE.WORK_DATEDateThe work date
Earned ValueBI_PM_EARNED_TIME_PHASE.EARNED_COSTCurrencyThe earned value on this work date
Earned RevenueBI_PM_EARNED_TIME_PHASE.EARNED_REVENUECurrencyThe earned revenue on this work date
Earned HoursBI_PM_EARNED_TIME_PHASE.EARNED_HOURSDecimalThe earned hours on this work date

Need Customer Support? We're Here To Help

Our 4castplus customer support team is ready to assist you with any questions or issues, ensuring you get the most out of our software.

Request A Personalized Live Demo

Experience a personalized live walkthrough of 4castplus and discover how our software can benefit your company. Let us know what you’re most interested in or what issues you are currently facing with your project management software. 

Speak With A Member Of Our Team

No other software offers such a comprehensive suite of project management and procurement tools. Schedule a meeting with a member of our team and see what 4castplus can do.