R2 2026 Is Here
Release Summary
What’s New R2 2026
These updates enhance overall system performance, reliability, and security, while improving how the platform operates behind the scenes. In addition, they establish a more scalable and flexible foundation, allowing us to deliver future enhancements and support evolving technology needs more efficiently.

Performance, Usability and User Interface Updates
This release includes a set of enhancements aimed at delivering a more efficient, intuitive, and visually consistent user experience.
Performance Improvements: Optimizations across the platform will deliver faster load times, improved system responsiveness, and greater overall stability.
Usability Enhancements: Key workflows and interactions have been refined to reduce friction, improve accessibility, and support a more seamless user journey.
User Interface Updates: A modernized design with updated layouts and visual elements will offer improved clarity, consistency, and ease of use.
Jobsite
Jobsite updates focus on keeping critical information in view and reducing repetitive navigation for field and site teams.
Dashboard Enhancements: The Jobsite Dashboard will remain fixed in position as you scroll, keeping key project metrics visible while you work.
Sustained Context: Screen state will be retained as you move between areas, so you spend less time re-establishing your place in the workflow.
Timesheet Control: A company preference will be added to disallow changes to timesheets once they are in the approvals workflow.
Project
Project updates give greater control over change orders and clearer visibility into budget that has not yet been approved.
Progressing – Resource-Level Forecasting: Updates to the Forecast to complete behavior at the resource level. Forecasts will now roll down from the workpackage to the resources, this provides a more consistent forecast across the platform and adds resource level forecasts without additional manual entry from the user.
Transmittal Mode: Project Transmittal Mode will be available on Fixed Price projects that contain Unit Price work packages, with the selected Transmittal feature then available in Jobsite.
Progressing – Pending Change Budget Columns: New Cost, Hours, Revenue and Unit Quantity columns on the Progressing screen and Quick Report will show only the unapproved change budget outstanding at each Progress Measurement date, separate from the Current Budget.
Change Management: A Re-Open Change Order function will be available to administrators, and a Custom Dataset will support the creation of custom change order forms.
Progressing – Remarks: Remarks entered in Progressing will flow through to requisitions created with the Tools > Purchasing workflow.
Change Management Import: Change orders will be able to be updated by import, overwriting by Cost Code or WBS Code with a smart sample of the current budget. Previously approved stages are unaffected, and import is disabled while a change is submitted for approval.
Progressing – Column Alignment: The Progressing Grid and Quick Report will offer the same columns with consistent names, including Workpackage custom fields.
Configuration
Configuration updates reduce repetitive setup work and expand the options available when preparing your data.
Cost Rate Table: Applied filters will be retained when navigating away from or refreshing the page, removing the need to re-apply them each visit.
Timesheet Control: A company preference will be added to disallow changes to timesheets once they are in the approvals workflow.
Resources: An import option will be added for Services, streamlining bulk setup and ongoing maintenance.
Notifications: A Commitment Threshold Notification Amount can be set in Company Preferences, triggering a notification when Purchase Order commitments exceed that amount.
Customer Resource Class Codes: Codes will be easier to maintain, with import available from the Customer profile. The import updates the Customer Code only — no resource classes are created.
Approvals
Approvals updates streamline the review experience so approvers can move through queues with fewer interruptions.
Adjustment Fields: Adjustment field checkboxes will remain fixed in position, keeping selection controls accessible while reviewing longer records.
Adjustments: An Import option with a sample file will be added to the Adjustment Entries grid, so groups of transactions can be updated at once.
Change Orders: A Re-Open Change Order function will be available to users with administrator permission.
Timesheet Control: A company preference will be added to disallow changes to timesheets in the approvals workflow, and Timesheet Administration will show Submit and Unsubmit buttons when a timesheet is partially submitted.
Purchase Requisitions: An approval workflow will be available for Purchase Requisitions.
Procurement
Procurement updates improve visibility of commitment controls and carry key identifiers further through the sourcing process.
Purchase Orders: The “Do Not Exceed Commitment” checkbox will remain in view, and will be added as a column on the Purchase Order summary grid and to the Excel export.
Request for Quote: Budget Item ID will be available on the RFQ Award screen and included in the RFQ Items export.
Purchase Requisitions: An approval workflow will be available for Purchase Requisitions.
PO Form Designer: A Procurement Milestones section will be added to the PO Form Designer.
Purchase Order Re-Open: Re-opening a Purchase Order will become a permissioned task, controlled by a new Administration permission.
Requisition Remarks: Remarks entered in Progressing will flow through to requisitions created with the Tools > Purchasing workflow.
Commitment Notification: A notification will be sent when Purchase Order commitments exceed the Commitment Threshold Notification Amount set in Company Preferences, and can be sent to a project role.
Vendor Invoice
Vendor Invoice updates extend bulk actions and improve how vendor resources are organized and filtered.
Third Party Expenses: The Select All workflow will apply to Unsubmit and Delete, allowing these actions to be completed in bulk.
Vendor Rate Table: Users will be able to assign a Division to a Vendor Resource Class when importing, improving Division filtering.
Invoice Tracking: Resource custom fields will be available in Vendor Invoice Matching, in both the transactions grid and the Vendor Invoice Items grid.
Reports
Reporting updates broaden the data available for analysis and correct inconsistencies in how transactions are represented.
Expanded Reporting Data: Inactive projects will be available as a reporting option, and the Project AFE/PO field will be added to the All Project Details report.
Improved Accuracy: Detail Reports will populate Supplier/Contractor/Department and Project Cost Code columns for Discount and Surcharge transactions.
Output Consistency: Billing Transactions in Custom Templated Reports will generate file names based on the invoice number.
Quick Report – Pending Change Budget: Cost, Hours, Revenue and Unit Quantity columns will show only the unapproved change budget outstanding at each Progress Measurement date.
Jobsite Report Designer: Business Dimension column widths will be retained, so the layout you set stays as you left it.
Time-Phased Report (Resources): Forecast columns will show Forecast to Complete values only and will no longer appear for past periods, Actual columns will no longer appear for future periods, and yearly totals will reflect the Forecast to Complete for the year. Where a progress measurement falls mid-month, that month alone will show both — Actuals for the month and the FTC for the current month.
Project-Level Custom Dashboard Reports: The “Incurred” figure in Project Summary & Details has been corrected so it no longer pulls the Vendor Invoice Amount.
Time-Phased Report (Resources) – Reporting Options: A prompt before the report is generated will offer the choice of weekly or monthly time periods.
Quick Report – Column Alignment: Columns will match the Progressing Grid, and the Excel export will match the formatting shown on screen.
FTE Report: A new Full Time Equivalent report will show baseline, actual and forecast labour as FTE shifts, weekly or monthly, with a chart, a data table and an Excel export.
Change Order Dataset: A dataset will be added for Project Change Order, so custom change order forms can be created.
Project Details – New Fields: Resource custom fields, four Labor name columns and four Transmittal fields will be available in Project Summary & Details and All Projects Detail.
Progress Measurement Dataset: A dataset will be added for Progress Measurement, so custom project reports can be built from progress measurement data.
Business Intelligence
Business Intelligence updates expand the data available for reporting and for building your own forms.
All Project Details Report: The Project AFE/PO field will be available in the report.
Features & Enhancements
Performance, Usability and User Interface Updates
- Update: Vendor Code will be shown in Vendor drop-down lists throughout the system.
- Update: Division filtering will be improved to better support working across multiple divisions.
- Update: Project reports will load faster on larger projects.
Program
- Update: The Program summary report dates are now sticky.
Jobsite
Dashboard
- Update: The Jobsite Dashboard will now be sticky.
Timesheet
- Added: A company preference will be added to disallow changes to timesheets in the Approvals workflow.
Project
- Usability: Project Transmittal Mode will be available on Fixed Price projects that contain Unit Price work packages, and the selected Transmittal feature will then be available in Jobsite.
Progressing
- Update: Updates to the Forecast to complete behavior at the resource level. Forecasts will now roll down from the workpackage to the resources, this provides a more consistent forecast across the platform and adds resource level forecasts without additional manual entry from the user.
- Added: Pending Change Budget columns for Cost, Hours, Revenue and Unit Quantity will be added to the Progressing screen and Quick Report, showing only the unapproved change budget outstanding at each Progress Measurement date rather than the combined Current Budget plus pending changes.
- Added: Remarks entered in Progressing will flow through to requisitions created with the Tools > Purchasing workflow.
- Update: The Progressing Grid and Quick Report will offer the same columns, using consistent column names across both. Workpackage custom fields will appear in both views, and the Quick Report Excel export will match the formatting shown on screen.
Change Management
- Added: A Re-Open Change Order function will be added to Change Management, for users with administrator permission.
- Added: A Custom Dataset will be added for Change Management, so custom change order forms can be created.
- Added: Change orders will be able to be updated by import. An Overwrite Change option will be available by Cost Code or by WBS Code, with a smart sample reflecting the current budget for the change. Previously approved stages will not be affected, and import will be disabled while a change is submitted for approval.
Configuration
- Usability: The Cost Rate Table now retains applied filters when navigating or refreshing the page.
- Added: A company preference will be added to disallow changes to timesheets in the Approvals workflow.
Resources
- Update: An import option will be added for Services.
Company Profile
- Added: A Commitment Threshold Notification Amount can be set in Company Preferences under Procurement, and a notification will be sent when Purchase Order commitments exceed that amount. The notification is set up in Configuration > Company Profile > Notifications and can be sent to a project role.
Customer Profile
- Usability: Customer Resource Class Codes will be easier to maintain, with import available from the Customer profile and a clearer list of resource classes. The import updates the Customer Code only — no resource classes are created.
Approvals
- Usability: The Adjustment Field Checkboxes are now Sticky.
- Usability: An Import option with a sample file will be added to the Adjustment Entries grid in Approvals > Adjustments, so groups of transactions can be updated at once.
- Added: A Re-Open Change Order function will be added to Change Management, for users with administrator permission.
- Added: A company preference will be added to disallow changes to timesheets in the Approvals workflow.
- Update: Timesheet Administration will display the Submit and Unsubmit buttons when a timesheet is partially submitted.
- Added: An approval workflow will be available for Purchase Requisitions.
Procurement
Purchase Orders
- Usability: The Purchase Order “Do not exceed Commitment Checkbox” is now sticky.
- Update: The “Do Not Exceed Commitment” checkbox will be added as a column to the Purchase Order summary grid and to the Excel export.
- Added: Re-opening a Purchase Order will now be a permissioned task, controlled by a new Administration permission.
- Added: A Procurement Milestones section will be added to the PO Form Designer.
- Added: A Commitment Threshold Notification Amount can be set in Company Preferences under Procurement, and a notification will be sent when Purchase Order commitments exceed that amount. The notification is set up in Configuration > Company Profile > Notifications and can be sent to a project role.
Purchase Requisitions
- Added: An approval workflow will be available for Purchase Requisitions.
- Added: Remarks entered in Progressing will flow through to requisitions created with the Tools > Purchasing workflow.
Request For Quote
- Added: Budget Item ID to the RFQ Award Screen.
- Added: Budget Item ID to RFQ Items Export.
Vendor Invoice
Third Party Expenses
- Usability: The Third Party Expenses Select all workflow applies to Unsubmit and Delete.
Invoice Tracking
- Added: Resource custom fields will be available in Vendor Invoice Matching – Invoice Tracking, in both the transactions grid and the Vendor Invoice Items grid.
Vendor Rate Table
- Usability: Users will be able to assign a Division to a Vendor Resource Class when importing the Vendor Rate Table, improving Division filtering.
Reports
Custom Templated Reports > Project > Project Change Order
- Dataset added – users can now create custom change order forms.
Custom Templated Reports > Project > Progress Measurement
- Dataset added – users can now create custom project reports based on progress measurement data.
FTE Report
- Added: A Full Time Equivalent (FTE) Report will be available in Project > Reports > Resources, showing baseline, actual and forecast labour hours as FTE shifts over a weekly or monthly interval, with a chart above and a data table below. Results can be filtered by resource class or category, WBS level and progress measurement, and exported to Excel.
Progressing > Quick Report
- Added: Pending Change Budget columns for Cost, Hours, Revenue and Unit Quantity will be added to the Progressing screen and Quick Report, showing only the unapproved change budget outstanding at each Progress Measurement date rather than the combined Current Budget plus pending changes.
- Update: The Progressing Grid and Quick Report will offer the same columns, using consistent column names across both. Workpackage custom fields will appear in both views, and the Quick Report Excel export will match the formatting shown on screen.
Progressing > Time-Phased Report (Resources)
- Update: Forecast columns will no longer display for past periods and will reflect Forecast to Complete (FTC) values only.
- Update: Actual columns will no longer display for future periods.
- Update: Yearly totals will reflect the Forecast to Complete (FTC) for the year.
- Update: When a progress measurement falls mid-month, the current month will be the only month to display both columns, with Actuals for the month and the FTC for the current month.
- Added: A reporting options prompt will be available before the Time-Phased Report (Resources) is generated, with the option to run weekly or monthly time periods.
Custom Templated Reports > Project Details
- Added: The following will be available in Custom Templated Reports > Project > Project Summary & Details, and Global > All Projects Detail:
- Resource custom fields
- Labor First Name (Resources)
- Labor Last Name (Resources)
- Labor First Name
- Labor Last Name
- Transmittal Date
- Transmittal Number
- Transmittal Title
- Transmittal Approval Status
Custom Templated Reports > Project > Billing Transactions
- Update: In Custom Templated Reports, Billing Transactions now generate the file name based on the invoice number.
Jobsite Report Designer
- Usability: Business Dimension column widths will now be sticky.
Detail Reports
- Update: The Supplier/Contractor/Department and Project Cost Code columns will now be populated for Discount/Surcharge transactions in all Detail Reports.
Project-Level Custom Dashboard Reports
- Update: Corrected an issue where Project Summary & Details “Incurred” was pulling the Vendor Invoice Amount.
Custom Templated Reports > Global > All Projects Summary
- Update: Inactive projects will be added as a reporting option.
Business Intelligence
- Update: Added the Project AFE/PO field to the “All Project Details Report.”
Previous Releases
Select a release to see what was new in it.
What’s New R2 2025
Release Summary
This Release Outline provides an overview of all updates that are included in the upcoming release. With this Outline, a new customer preview environment has been provided to you for you to access and review the new features. This environment can be accessed at https://comingsoon.4castplus.com.
As with all our pre-release environments, please remember to refresh your browsers each time you log into the environment. Additionally, Custom Reports in the comingsoon environment are samples only. Please upload the templates from your Live System, for any Custom Reports that you wish to review.
Performance, Usability and User Interface Updates
- Updated the workflow for users that have Approval access only, when they login they will open to the Approvals screen.
API / Integrations
- Opened up the Customer Invoice API to enable Third Party to pull from 4castplus.
- Updates to the PO Receipt Export API
Configuration
Manage Codes & Fields
Management of Change
- Added Manage Change Stages in Configuration.
Procurement Fields
- Added the Procurement Milestone Planning in Configuration > Manage Codes and fields > Procurement. This allows the user to configure the Milestones used by the Company.
Manage Codes & Fields - Custom Fields
Vendor Invoices
- Added the ability to edit a Vendor Custom Field in Purchase Order and Vendor Invoice.
- Added Vendor Invoice Item Custom field in Configuration to be included in Vendor Invoice Items transactions.
Procurement
- Added the ability to Activate / Inactivate a Custom Procurement Item field in the grid without opening the Edit window.
Manage Resources
Labor
- Add a workflow to re-assign the Project Manager role upon Labor Termination or Inactivation; re-assigning applies to Active, In Bidding and Waiting to Start Projects. When a user is terminated / Inactivated the company will no longer be required to re-assign on Completed and Inactive Projects.
- Updated the Supervisor field to only be mandatory if Timesheet Approval workflow is enabled.
Vendors
- Optimized the Configuration > Manage Resources > Vendors > Vendor Detail transaction report.
- Added a Duplicate workflow in Vendor > Labor tab.
- Removed Expenses and Other Charges as an option in Vendor Classes; this workflow was obsolete.
Permissions
- When Manage Folder Permission is disabled, removed the ability to create and edit a Program
- Updated and added Vendor Invoice Permissions for each section and View Only.
- Updates to Procurement Permissions to support View-only licenses.
- Defect Fix: Timesheet Entry user with permission to upload Documents is not seeing the Document section in the User Interface.
- Defect Fix: User with the Create and Update Purchase Order permission disabled can edit Purchase Order Line items. The update prevents editing of the entire Purchase Order.
Rates Administration
- Usability update to the Resource Class Cost Rate Table when the table is saved.
Workflows
- Updated formatting on Configuration> Worflows> Expand the side menu > Select the 'Jobsite Timesheet' Workflow > to Excel
- Update formatting of the Configuration> Worflows> Expand the side menu > Select the 'Vendor Invoice' Workflow > to Excel
- Update the formatting of the Configuration> Worflows> Expand the side menu > Select the 'Purchase Order' Workflow > to Excel
Projects
Setup
- Added workflow to prevent Currency Change after a Project is in Progress
- Added 'Change Stages' tab in the Edit / New Project Profile workflow which will enable the user to enable the Change Order Approval and Stages used in the workflow at the Project level.
- Added a Transmittal option toggle for Customer Portal or Email when the company users Jobsite Timesheet Packages.
Program
- Added PO Line Item # to Program Detail - All Project Detail Report.
WBS
- Optimized the Update WBS item workflow.
- Optimized the WBS for load performance improvements.
- Updated the WBS drag and drop sensitivity to reduce the risk of accidental movement.
- Align the WBS workflow filtering behavior to the Progressing filtering behavior.
- Added the ability for a Company to define the size of the Projects WBS grid in Company Preferences.
- Added a new display permission for Vendor Invoices in the WBS user interface and WBS import. When the permission is enabled, the user can select the workpackage in Vendor Invoices > Third party Expenses and Direct to Invoice 'Add Item' workflow.
- Added a Control in the WBS that prevents changing the Billing Type from Unit Price to Cost Plus if there exists Progress transactions.
- Defect Fix: Updates to Baseline Start and Finish Date completed via WBS import were not being reported in the Project Audit Log.
- Defect fix: Planned Daily Average Units is not recalculated when Dates change.
WBS Import
- Added the following columns to the WBS user interface and WBS Import:
- Progressing Method.
- All user-created custom fields.
- Added control to prevent a Workpackage Custom Field to be added to an Area or Phase through the WBS Import.
Resources
Resource Reports
- Equipment Resource Report - Equipment Code added in UI but not Project Resource Report.
- Added Reports To Supervisor to the Labor Summary Report.
- USABILITY: Corrected the % Totals in the Labor Summary Report.
- Remove 'Average Unit Cost' total from BI > Resource Reports > Equipment Report > Equpment Costs by Project
Budget
- Updated the Budget Cost Rate and Billing Rate rounding to have the same behavior.
- Optimized the Undo Baseline workflow in Budgeting
Progressing
- Update: Added SPI (Hours) to Progress Tab.
- Update to Resource Forecast when the Forecast is a negative value. Negative Forecasts now carry forward to the next Progress Measurement.
- Updated the Assigned Resource Estimate import; added Employee ID on the Labor tab.
- Updated Progress import name to 'Import Direct Entry Progress"
- Deprecated Progress Weighting in the Progressing workflow
Billing
- Enabled "Cash Inflow Report"
- Usability update to make Payment Terms in Billing Sticky.
- Updated the Jobsite Package # display in Billing > Documents to reflect the correct Package #
- Updated Billing Tax selection to only include Taxes selected in the Project Profile.
- Update filter behavior for Entry Id field in the Billing Transaction selection grid.
- Added alert in Billing when there are pending Customer Transmittals.
- Added Custom Templated Billing Transaction and Fixed Price templated assigned to the Project to the Billing > Invoice > Reports drop-down to print as a PDF.
- Added Procurement Milestone Receipts to the Billing workflow.
- Added a Print Document Package in Billing > Invoice > Reports that will print the selected Custom Templated report and Documents to display on the Invoice.
- Added First Name and Last Name column in the Billing Transaction selection grid and the Export transactions to Excel report.
- Defect Fix: Customer Invoice Approval Delegation of Authority is not routing as expected.
- Defect Fix: Display only documents attached to the selected Jobsite Package/Transaction
Change Management
- Optimized the Change Order Summary grid.
- Updated Change Status column to Change Workflow column, status included; In Process, In Approval, Cancelled and Committed.
- Updated the Change Order Details tab and Import files to include the following fields:
- Add Change Stage,
- Current Change Status,
- Save Status
- Status Date
- Check Box to Override Stage
- Check box for Include in FTC?
- Updated Change Order form for Proposed Change Orders.
- Update Change Order Import for defined Resource Budgets Labor tab Employee ID column and Equipment Tab Equipment ID column.
- Updates to Change Order Detail report for enhancements to Change Management.
- Updates to Change Management Summary Report with enhancements to Change Management.
- Added a 'Hide on Timesheets' workflow to Change Management.
- Added Vendor Invoice Display permission in Change Management; when enabled, a user can add a Third Party expense to a Change Order.
- Added Change Order Audit History report in Change Management Reports.
- Added a 'Saving Change' alert on a Budget Transfer to prevent the Edit window from hanging.
- Added validation on Change Order import for mandatory Custom Fields.
- Defect Fix: Remarks and Tag Number is being cleared when a Budget Transfer is saved.
- Defect Fix: Updated Custom Change Order field presentation of Percentages.
- Remove 'Is Adjustment' from the Change Order Import.
- Data migration of existing Change Orders to the new Change Order Stage Status as follows:
- OLD: Proposed Change Orders => NEW: Workflow Status = In Process
- OLD: Submitted Change Orders => NEW: Current Stage Status = Submitted
- OLD: Rejected Change Orders => NEW: Current Stage Status = Rejected
- OLD: Committed Change Orders => NEW: Workflow Status = Committed
- Rename to 'Update Resource Qty when Task Qty Changed' to 'Fixed Unit Rate when Progress Qty Changed' in the Change Order Profile Details tab.
- Design Note: After Final Approval, Change Orders are recorded in the Project Current Budget using the Change Order Identification Date. Unsubmitting a Progress Measurement may impact the reported Current Budget and related reporting figures.
Budget, Budget Revisions, Forecast & Progress Measurements
Budgeting
- Added 'Part Number' to Budget / Progressing > Purchasing Item selection grid.
Forcasting
- Updates to Forecast to Complete when Change Order Stage has "Include in FTC?" checked
Procurement
- Added alert when an edit is made to a Procurement line item on an Inactive Workpackage and when the Procurement Display permission is disabled.
- Prevent the ability to upload a document on a Closed Purchase Order through the Vendor Portal
- Added a configurable notification called 'Purchase Order Bypass Approved' to be sent to the Project Manager by default when a Purchase Order has been Bypass Approved.
Requisitions
- Defect fix re: Column Selection in Requisition Summary grid is not sticky.
- Update to Requisition and Purchase Order detail grid, when the Import option is import by WBS enable the user to update the WBS by selecting the WBS field.
- Update: A Progress Bar has been added to Procurement Requisition Import Workflows.
- Added Area and Phase columns to the Requisition Add Item workflow.
- Added workflow to transfer Requisition header Milestones to RFQ header when using the Add to RFQ workflow.
- Added 'Part Number' to Budget / Progressing > Purchasing Item selection grid.
- Added Planned and Scheduled dates in the Requisition Header that are selected for the Requisition workflow in Configuration > Milestone Planning.
- Updated Requisition Summary Report to reflect the changes to Milestone Planning.
Details Grid
- Added the following system Milestones Dates to the Requisition Details grid User Interface, Export to Exce,l and Requisition Import:
- System Milestone (Planned) Dates if the Requisition workflow is selected in Configuration > Milestone Planning
- System Milestone (Scheduled) Dates if the Requisition workflow is selected in Configuration > Milestone Planning
- Custom Milestones (Planned) dates if the Requisition workflow and Line item is selected in Configuration > Milestone Planning.
- Custom Milestones (Scheduled) date if the Requisition workflow and Line item is selected in Configuration > Milestone Planning.
- System Milestone (Planned) date if the Requisition workflow and Line item is selected in Configuration > Milestone Planning
- System Milestones (Scheduled) date if the Requisition workflow and Line item is selected in Configuration > Milestone Planning.
Purchase Orders and Subcontracts
- Vendor and PO Custom Fields are now read-only when a PO is Committed.
- Removed control that prevented the PO Issue date from being in the future.
- Removed table columns:
- Incremental Tax
- Incremental Project Cost Tax Amount
- Previous Project Cost Tax Amount.
- Updated Purchase Order default spend and cashflow behavior. When the Required at Site (Forecasted) values are updated in Milestone planning the default spend and cashflow are updated.
- Update to Requisition and Purchase Order detail grid, when the Import option is import by WBS enable the user to update the WBS by selecting the WBS field.
- Update Purchase Order Import by WBS when there is multiple Cost Codes for one workpackage to import Cost Code as blank.
- Added the ability to Delete a Line Item on a Purchase Order Revision.
- Added a Milestone Planning section in the Purchase Order Header user interface and PO Import Header tab, including the following:
- System Milestone with the PO workflow selected in Configuration > Milestone Planning
- Custom Milestons with the PO workflow selected in Configuration > Milestone Planning.
- Added the ability to link a Procurement Milestone to a Payment event. When the Milestone is selected as a Payment Event in Procurement Milestone Planning the Milestone will also be included in Configuration > Payment Events.
- Added workflow upon RFQ Award to PO to transfer the RFQ Header Milestone Dates to the PO Milestone Planning section.
- Added Spend Scheduled and Forecasted dates to the Purchase Order Spend Forecast (To Excel) Details tab.
- Added an Actuals column for each period in the Purchase Order Spend Forecast (To Excel) Details tab
- Added Area and Phase columns to the Purchase Order Add Item workflow.
- Added the ability to add a Milestone Payment to a Vendor Invoice without a received Quantity.
- Added the ability to create a Header or Line item Custom Milestone; this creates a Planned, Scheduled, Forecasted, and Actual date for tracking throughout the Procurement workflow.
- Added the ability to transfer Requisition Header Milestones to the Purchase order Milestone Planning header through the Add to Purchase Order workflow.
- Added new system Line Item Milestone 'Final Document Due Date.'
- Defect Fix: When users are assigned to a Project with multiple Resource Classes, the RFQ and PO Role assignment listing shows the labor resource multiple times.
- Defect Fix: Whoops alert when awarding an RFQ Line item to a Contract and then to a Purchase Order.
- Defect Fix: The Apply Taxes? checkbox is not sticky on Purchase Orders and Subcontracts.
PO Item Allocation grid
- Added the following system Milestones Dates to the PO Item Allocation User Inferface, Export to Excel and PO Import:
- Final Document Due Date (Scheduled)
- Custom Milestones (Scheduled) date if the Requisition workflow and Line item is selected in Configuration > Milestone Planning.
- System Milestones (Scheduled) date if the Requisition workflow and Line item is selected in Configuration > Milestone Planning.
PO Form
- Updated Unit Cost field in the Purchase Order Form Item section to populate as entered in the PO Item.
- Added Vendor Custom Fields to PO Form Summary - Header section.
- Defect Fix: Purchase Order Form Item Section Title is not being included on the PO when the Include in Form checkbox is checked.
Payment Schedule
- Updated the Payment Schedule Revision workflow, the user will no longer be able to Commit a Revision without updating the Payment Schedule for the PO or PO Line item. The system will present a suggested allocation when the Payment Schedule is edit and the user can edit as required.
- Updated date behavior in the PO > Payment Schedule, when the Scheduled date is updated the Forecasted date is updated.
- Update the PO > Payment Schedule Holdback Payment event total Allocation calculation when Milestone Receipts selected to be generated. Holdback Milestone Receipts will not generate and will not be included in the PO Spend Forecast.
- Updated the behabior of the Payment Schedule upon Revision.
- Added the ability to auto generate a Milestone receipt when the Actual Date is in the future.
- Added Spend - Actual column in the PO Payment Schedule. The Actual Date will populate in the PO Spend Forecast report as entered or auto-populated.
- Added the ability to add a Payment Schedule at a Purchase Order level.
- Added the Payment (Scheduled) and Payment (Forecasted) to the PO Cashflow Report Detail tab.
- Added the ability to generate a Payment Schedule and auto-generate Milestone Receipts at the PO Line item level. The system will generate a receipt consolidating all line items with the same Actual Date on the specific Milestone.
RFQ
- Update Bid Close Date (Actual) to populate when Bid Close Date is in the past; in reports and UI.
- Added Area and Phase columns to the RFQ Add Item workflow.
- Added workflow to transfer Requisition header Milestones to RFQ header when using the Add to RFQ workflow.
- Added workflow upon RFQ Award to PO to transfer the RFQ Header Milestone Dates to the PO Milestone Planning section.
Expediting
- Expediting Target sort order has been set to a default order when the Company has not overridden the order pre-release.
- Update: A Progress Bar has been added to Procurement Expediting Import Workflows.
- Updated Expediting Target default order if they have not already been set in the live system.
- Updated the Expediting workflow to optimize performance. The items listing is now paged and only 5 items are displayed at a time.
- Added new Expediting Milestone: Kick-Off Meeting Date (Forecasted) and Kick-Off Meeting Date (Scheduled).
- Added the following system Expediting Milestones and Targets to the Expediting Milestone Planning, Detail grid, and Intelligent Import.
- Added a Milestone Planning section in Expediting Purchase Order Header.
- Added Expediting Milestone Planning section fields to the Update Details workflow in the Expediting Details grid.
- Added the following fields to the Expediting Detail grid and Intelligent Import file:
- Materials Receipt Report (MRR) Due Date (Scheduled) / (Forecasted) / (Actual)
- Final Document Due Date (Scheduled) / (Forecasted) / (Actual)
- Final Document Approval Date (Scheduled) / (Forecasted) / (Actual)
Recieving
- Added Packing Slip Number column.
- Added Milestone Receipts for Milestone Progress Payments. A receipt is auto-generated when the Milestone Actual Dates are entered.
- Added a system email when a Milestone Receipt fails to generate.
When the validation fails:- Send the validation message to the PO buyer.
- If the PO Buyer is not set up or does not have an email, then send the email to the Project Manager.
- Added the ability to Progress using Milestone Receipts and Receive physical Quantities in PO Receipts and Subcontract Receipts without incuring costs. Costs are incurred through the Milestone Receipt and Quantity is incurred through PO Receipts.
- Added a new tab in Procurement Receiving called 'Milestone Receipts'; receipts in this workflow will auto-generate based on the Milestones set up in the Purchase Order Payment Schedule. When the Milestone is completed (Actual Dates populated) the receipt is created but then can be modified by the user as required.
- Update the Subcontract Receiving > Time and Material Receipt > Edit workflow for Expenses so that Resource = Vendor Name and Expense Description field is added and can be edited.
- Usuability update to Receiving workflows to display a Progress Bar while the Receipt is being saved.
- Defect Fix: Whoops when importing multiple files on a Time and Material Subcontract. The update prevents the ability to select multiple import files.
Reports:
- Updated Total Adjustments (PO CCY) > Total Adjustments (Pre-Tax) ( PO CCY)
- Updated Total Adjustments (BASE CCY) > Total Adjustments (Pre-Tax) (BASE CCY)
- Added Payment Schedule Details to the PO Cashflow Details tab.
- Added Vendor Custom Fields to the Purchasing Summary report Transaction Summary and Transaction Detail tabs.
- Added Total Adjustments (PO CCY)
- Added Total Adjustment (Base CCY)
- Unreceived Amount (PO CCY) > Unreceived Amount (Pre-Tax) (PO CCY)
- Unreceived Amount (BASE CCY) > Unreceived Amount (Pre-Tax) (BASE CCY)
- Defect fix re: Summary Purchasing Report discrepancies in Transaction Summary and Transaction Detail.
Jobsite / Timesheet
Jobsite
- Optimized the Jobsite Timesheet Save performance.
- Added ability to approve a Transmittal via email.
- Added a Transmittal Package Print to PDF that transfers automatically to Billing using the Jobsite timesheet Billing Mode.
- Defect Fix: Whoops when an Administrator selects unapproved on an Approved Jobsite Timesheet; the Unapprove workflow is used to Unapprove Administrative Approvals only.
- Defect fix: Vendor Invoice Matching Revenue Adjustments were not referencing the Jobsite Timesheet number in the Custom Templated Billing Transaction datasets.
Transmittals
- Update to prevent Unapprove in Jobsite Timesheet All Submissions workflow on a Jobsite Timesheet Package that has been approved through a Transmittal
- Updated Transmittal Report to include standardized Titles
- Updated the default transmittal expiration to 30 days (previously 5 days).
- Update to prevent Unapprove in Jobsite Timesheet All Submissions workflow on a Jobsite Timesheet Package that has been approved through a Transmittal.
- Added the ability to Reject a Jobsite Timesheet Transmittal via email.
- Added a warning alert when submitting transmittals, showing how many days remain before the expiration date.
- Added alert in Billing when there are pending Customer Transmittals.
- Disabled Billing Adjustments when the Billable Transaction is approved through an emailed Transmittal. Note this is the same behavior as Customer Portal Approved Transmittals.
Jobsite Timesheet Report Designer
- Updated Jobsite Timesheet Report designer to support the updates to Vendor Invoices.
Daily Log
- Added the ability to create a drop-down list in the Jobsite TImesheet Daily Log Section.
Timesheets
- Defect fix re: Reduce deadlocks when saving a Jobsite Timesheet that includes surcharges or discounts alongside Timesheet Entry timings.
- Defect fix: Updated the My Timesheet Submitted Date to be the Date the Timesheet was originally submitted, versus the last modified date.
- Defect Fix: The hours status report was not showing Unsubmitted timesheets in the Unsubmitted column.
- Removed Third Party Expenses from the Timesheets area and moved it to Vendor Invoices> Third Party Expenses for Accruals or Direct to Invoice for Direct Costs when Vendor Invoice Matching is enabled.
Approvals & Administration
Approvals:
- Added Project filter on all Approval workflow 'Waiting for My Approval' tab.
Purchase Order Approvals
- Updated filter behavior in Purchase Order Approval workflows for numeric fields.
Jobsite Approvals
- Update to prevent Unapprove in Jobsite Timesheet All Submissions workflow on a Jobsite Timesheet Package that has been approved through a Transmittal.
Change Order Approvals
- Updated the Change Order Detail information to reflect the enhancements to Change Management.
- Updated the following in Change Order Approvals All Submissions tab:
- The filters are now using Change Stage Status filters instead of Approval Status filters.
- Added To Excel
- Added Update button
- New columns added for Workflow and Stage Status
- Column renames for consistency
- Non-workflow change orders are now filtered out.
- Updates to Change Order Approval My Submissions tab:
- Optimized performance
- Removed Cost/Revenue/Hours columns
- Added To Excel button
- Updated column names to align with enhancements in Change Management
- Added workflow and stage status columns.
Close Period
- Moved Third Party Expense Period close workflow to Vendor Invoice Matching
Administration
Adjustments
- Updated field selection options when user is adjusting a Third Party Expense.
- Updated Third Party Expense Adjustment workflow removing the ability to change the Vendor and Vendor Document #.
- Update the Adjustment workflow for Third Party Expense, removed the ability to update Rate Type after the Third Party Expense has been invoiced by the Vendor.
Vendor Invoice
- Migrated all existing Third Party Expense timesheets to Third Party Expenses. Each Vendor Document created in weekly timesheets is now it's own separate Vendor Document and not linked to a weekly Timesheet.
- Enable Holdback and Holdback release on Third Party Expenses in Direct to Invoices and Vendor Invoice Matching.
- Moved Vendor Invoice Matching from Approvals to Vendor Invoices.
- Moved Weekly Timesheet > Third Party Expenses to a new Tab in Vendor Invoices
- Moved the Third Party Expense Transaction Import to Vendor Invoices > Third Party Expense.
Added the ability to import Expenses on the Third Party Expense Import.
- Updates to Support Vendor Currency for Third Party Expenses
- Added the ability to add a Non-Procurement Cost in Direct to Invoice.
- Added Receipt Documents to flow through to Vendor Invoice Matching to attach to a Vendor Invoice.
- Add Entry Id field to Third Party Expenses and Invoice tracking.
- Added the ability to support taxes on Third Party Expenses through Direct to Invoice.
- Added new entry Type 'Third Party Expense'
- Add Custom Vendor Invoice Item Custom field to the following imports:
- Direct to Invoice
- Third Party Expense
- Added a Remove Item workflow in Direct To Invoice to delete non-procurement Items from a Vendor Invoice.
- Added the ability to enter a Vendor Invoice for a non-Procurement item, a three way match will no longer be required for Third Party Expenses.
- Added the ability to edit a Vendor Custom Field in Purchase Order and Vendor Invoice.
- Added a new section called 'Vendor Invoices'.
- Updated behavior for Item Description and Description on Third Party Expenses.
- Updated the Third Party Expense import when the Company Preference 'Enable users to select Cost Code' is enabled. The Cost Code field is now one column instead of a column for each Cost Code component.
- Updates to the Direct to Invoice import as follows:
- Remove Project Code from the Header tab
- Added the ability to import Direct to Invoice non-Procurement Costs.
- Added the ability to import Expenses.
- Updated behavior when Vendor Invoice Matching for Weekly Timesheets is disabled, Third Party Expense Vendor Document requires to be Submitted to be available in Billing transaction selection grid.
- Deprecate the comments column in Direct to Invoice, PO Line item detail. All Data is migrated to Comments (Billable)
Vendor Invoice Matching
- Added control in Vendor Invoice matching so that Quantities entered in PO Receiving and Subcontract receipts will not show up for selection on a Vendor Invoice when Milestone Receipt is generated.
- Added support for discounts and surcharges for Third Party Expenses.
- Added: Update Button to Vendor Invoices.
- Added a data check to help ensure vendor invoice currency information is consistent.
- Added permission for Vendor Invoices > View Vendor Invoice.
- Added a new display permission for Vendor Invoices in the WBS user interface and WBS import. When the permission is enabled, the user can select the workpackage in Vendor Invoices > Third party Expenses and Direct to Invoice 'Add Item' workflow.
- Added Unsubmit 3rd Party Expenses Vendor Document Permission.
- Added the ability to add a Billable Third Party Expense to a Fixed Price and Unit Price workpackage to align with the Procurement Markup? workflow. When the workpackage is Fixed Price or Unit Price the Markup? checkbox will be deselected by default but can be manually updated by the user. When the Markup? checkbox is checked the default Markup % will be the Workpackage Third Party Markup.
- Added Packing Slip Number column
Third Party Expenses
- Update behavior for Timesheet Entry and Project Manager; the user is now required to be assigned to a Project / Workpackage to enter a Third Party Expense.
- Added a Document upload workflow in Third Party Expenses
- Disabled Third Party Expense Pass through Costs
Project Reporting
- Optimized the Time-Phased Report (Resources) report in Projects
- Added PO Line Item # to Project Summary and Detail Reports
- Added new Report in Project > Reports > Quick Reports called Project Summary by Resource Type (Cost)
- Update the display of all Percentage Custom Fields; instead of .17 for 17% it will be displayed as 17%.
- Update: Added SPI (Hours) to Project Summary Report.
- Updated Project Report Current Budget Cost, Hours, and Revenue to reflect the enhancements to Change Management.
- Update: Project Resources Report to separate Labor Resources into First Name and Last Name.
- Updated the following fields in Project Reports to reflect the Change Management enhancement:
- Planned Value
- Planned Hours
- Earned Value
- Earned Revenue
- Earned Hours
- Removed Billable and Pending Totals on the Transmittal Status report because Transmittals with multiple Contacts were showing up multiple times, skewing the total values.
- Defect Fix: Updated filter behavior for currency fields.
- Defect Fix: Corrected the Project Summary Report - Resource Report (Revenue) % Complete value on Rollup Workpackages.
- Defect fix re: When Time-Phasing is Weekly of Earned Value S-Curve Period Start Dates is different from Time-Phasing.
- Defect fix re: When Start Date is later than End Date, there should be no Timeline Chart S-Curve/Project Spend Forecast data/graph displayed.
- Defect Fix: Updated the AFE/PO behavior to align with the original design; In the Project Detail Report the AFE/PO should Display as per header, if overridden at Area then display Area, if overridden at the Phase display Phase, if overridden at the Workpackage display Workpackage
Custom Reports
- Update to Custom Templated Title Names:
- Incurred > Incurred (Pre-Tax)
- Incurred w/Taxes > Incurred
- Invoiced Amount w/Taxes > Total Invoiced
- Update to the 'Item Date' behavior when an RFQ is issued to a Vendor/Vendor Date and not awarded to a PO.
- Updated the following field behavior in Custom Templated report WBS (Cost) dataset to reflect the beginning of the Project to the "To Date:
- Actual Cost To Date.
- Actual Revenue To Date.
- Quantity to Date.
- Added Employe ID to Billing Transaction Custom Templated report dataset
- Added Project Description to Custom Templated Reports.
- Added 'Incurred Project Tax' column
- Added column 'Invoiced Project Tax' column
- Added Column 'Committed Project Tax' column.
- Added RFQ Custom Fields to All Procurement Item datasets
Custom Global Dashboard Reports
- Added new Custom Global Dashboard Report called 'Project Labor Role Assignments' which reports the Role assignments on all Projects.
Documents
- Add 'Select All' to Documents> Repository Search & Manage / Relabel to Search & Manage
Business Intelligence Reporting
- Configure the Weekly Assignment Report to reflect the new Change Order Stages workflow. The user will not see any changes, only Committed Change Order Hours will be reported.
- Added Project Status column to the Change Management Summary Report user interface and export to excel.
- Updated Change Management Summary and Detail report to reflect the changes to the Change Management feature.
- Updated the following fields in all Business Intelligence reports to reflect the enhancements to Change Management:
- Current Budget Cost
- Current Budget Revenue
- Pending Budget Cost
- Pending Budget Hours
- Current Budget Hours
- Pending Budget Hours
- Planned Cost To Date]
- Planned Hours To Date
- Budget Available
- ETC
- EAC
- FTC
- FAC
- Planned Cost to Date,
- Planned Hours to Date,
- Planned Cost To Date
- Planned Hours To Date
- Forecast To Complete (FTC) - Cost
- Forecast At Complete (FAC) - Cost.
- Added Reports To Supervisor to the Labor Summary Report.
- USABILITY: Corrected the % Totals in the Labor Summary Report.
- Remove 'Average Unit Cost' total from BI > Resource Reports > Equipment Report > Equpment Costs by Project
BI Analytics Platform and Schema updates
Schema changes to the BI Analytics Data transfer can be viewed in DBU_DATA_[company database]. If your company has the BI Analytics Platform please review to ensure existing dashboards and reports built will run as expected after release.
The following changes are included in the Schema changes but are not limited to:
Merge VENDOR_ATTEST_SUBMISISON table columns to the VENDOR_INVOICE table.
Updates to the following Data Views:
- CHANGE_ORDER_APPROVAL_STATUS_VIEW
- CHANGE_FUNDING_SOURCE_DETAIL_VIEW
- PROJECT_STRUCTURE_BUDGET_TOTALS_VIEW
- BUDGET_BY_PROJECT_VIEW
- PROJECT_BUDGET_TOTALS_VIEW
- BUDGET_BY_COST_CODE_VIEW
- TASK_RESOURCE_ESTIMATE_VIEW
- PROJECT_STRUCTURE_ESTIMATED_UNIT_QUANTITY_MIN_VIEW
- PROJECT_STRUCTURE_ESTIMATED_UNIT_QUANTITY
- PROJECT_CONTINGENCY_VIEW
- PROJECT_ESTIMATE_VIEW
- TASK_ESTIMATE_VIEW
- BUDGET_FIXED_PRICE_TRANSACTION
- PROJECT_ESTIMATE_NUMBER_VIEW
- PROJECT_STRUCTURE_ROC_RULE_SET_RULE_UNIT_QUANTITY
- BUDGET_BY_RESOURCE_ESTIMATE_KEY_VIEW
- BUDGET_BY_TASK_DATED_VIEW
- BUDGET_BY_TASK_RESOURCE_DATED_VIE
Added new Table to support Vendor Invoice enhancement; Table Name: VENDOR_INVOICE_TXNS
What’s New R1 2025
Release Summary
This Release Outline provides an overview of all updates that are included in the upcoming release. With this Outline, a new customer preview environment has been provided to you for you to access and review the new features. This environment can be accessed at https://comingsoon.4castplus.com.
As with all our pre-release environments, please remember to refresh your browsers each time you log into the environment. Additionally, Custom Reports in the comingsoon environment are samples only. Please upload the templates from your Live System, for any Custom Reports that you wish to review.
Performance, Usability and User Interface Updates
- Added ability to attach an Outlook.net file to all Attach Documents features
- Increased the maximum length of the 'Tag Number' field from 50 to 100 characters.
- Update: Reports include users who added or updated the "Email" field in the Labor Information tab.
- Updated the profile icon drop-down menu—'Profile' is now labeled as 'Accounts'
- Improved loading time of 'Project Cost by Labor Resource' dashboard report.
- Improved loading time of the Project Profile detail query.
- Improved loading time of the Requisition Items - Allocate to Purchase Order pop-up query.
- Updated the Project Dashboard Revenue Metrics Panel to use minimal query.
- Performance: Optimized project reports.
- Usability: Defect fix re: When a request is submitted, the dropdown text overlaps with the screen text, reducing readability.
System Configuration
Organization
1. Company Profile
- Preferences
- Update: Company Preference Workdays have migrated to the new Project Time Phasing Settings.
- Update: Project verbiage from the Workdays tab in Company Preferences has been removed.
- Added the Procurement import Preference Import preference; By WBS or By Cost Code.
- Added new tab – Workdays
- Added ability to set default Time phasing Perion to month or Week
- Added ability to see standard workdays
- Added ability to add exception days (like holidays) on corporate level. These exception days will be included in Time Phasing
- Notifications
- Added: Procurement fields available to populate in Procurement Notifications: Vendor, Purchase Order Total Cost (Base CCY), and Purchase Order Total Cost (Purchase Order CCY)
- Removed the Notification for 'Document Approval - Bottlenecked'.
- Form Numbering
- Defect fix re: "No" button in the alert confirmation re: acceptance of change of Start Value is not responding.
- Taxes
- Defect fix re: Alert prompted when trying to Import Tax Types.
2. Manage Codes & Fields
- Custom Fields
- Custom Fields
- Update to Custom Fields text limit to 255 characters.
- Defect fix re: The Custom Fields dropdown values are edited in Configuration, then the previously saved value should also be updated.
- Procurement
- Defect fix re: When Custom Fields for Procurement dropdown values are edited in Configuration, then the SAVED values in RFQ/ Purchase Order/ Receipts will disappear.
- Procurement Items
- Added ability to filter for the Multi-Line Custom Types.
- Defect fix re: When Procurement Item dropdown values in Configuration are edited, then the saved values in Requisitions, RFQs, POs, Receipts, Expediting, and the Vendor Portal RFQ will not appear.
- Updated the Procurement Import Custom Field Names to not include the “Custom Property” in the title.
- Custom Fields
- Procurement Fields
- Defect fix re: Duplicating Payment Event does not create a duplicate Payment event.
- Procurement Fields
3. Resources:
- Usability:
- Updated the Import for invalid Accounting Codes for Resources to display in one error message (Equipment, Materials, Services, Labor, and Expenses).
- Labor:
- Updated 'Supervisor' field to be required only when the Timesheet Approval Role is Project Manager.
- Updated Import file to include Inactive Resources in Class tab
- Defect fix re: column filtering for drop-down fields.
- Defect fix re: Editing multiple Labor Resource in Configuration > Manage Resources the User Interface will hang.
- Defect fix re: The Vendor Portal Login should be disabled when the Resource is set to Inactive via Import.
- Vendors
- Defect fix re: column filtering for drop-down fields.
- Defect fix re: Import failing when Vendor Portal Users are marked as Inactive.
- Defect fix re: Active vendor contacts can still access the portal even if the vendor is inactive.
- Updated: The "Last Modified On" and "Created On" columns to use "Date Filtering.'
- Added Vendor Custom Fields to the Equipment and Material Resources Vendor Selection grids.
4. Rate Administration
- Rate Types
- Added an alert to prevent the creation of a Composite Rate Type that is not hours-based.
- Defect fix re: When Composite Rates are set to Inactive, the rates should not be displayed.
- Defect fix re: A Composite Rate Types with no Cost or Billable Components should not be available in Timekeeper or My Timesheets.
5. Approval Workflows
- Defect fix re: When clicking Excel, the side menu will collapse, and the Report does not generate.
Projects
1. Usability
- Improved performance of ‘Project Cost by Labor Resource’ dashboard chart.
- Updated the Duplicate Projects function to prevent data bust issues.
- Defect fix re: Most Recently Used project display is incorrect for users with Procurement Plus License Profile
- Defect fix re: When duplicating a project, the Crews are not copying.
- Update the Project Profile pop-up window to be wider.
- Optimize Project Dashboard > Project Hours By Resource Class chart.
2. Setup
- Enhancement: The Time-Phasing set up has been added to the Project Profile Workdays tab.
- Performance Update: Improved the Project Time Phasing Reporting
- Defect fix re: Duplicate does not copy Addresses
- Defect fix re: Billing Codes that are 'multi-line' type are not displayed
- Defect fix re: Duplicate does not copy Discounts and Surcharges. Defect fix re: The CBS Billing Codes - percent type should not multiply by 100 during the import.
3. Dashboard
- Defect fix re: Fully Committed Budget is not including Project Cost Tax when the option selection is "Include Overages and Adjustments from Line Items when All Receipts plus Overages and Adjustments exceed Purchase Order Commitment."
- Defect fix re: When changing the Billing Type of a project is changed from Time and Material to Fixed Price, Unit Price, Cost Plus or Cost, the Billing Rate Table should be disassociated from the project.
- Performance updates on the Project Spend Forecast workflow.
- Remove ‘Null’ option in the Projects - Projects Dashboard - Filter By drop-down list
4. WBS
- Updated label in WBS > Display permissions tab to ‘Allow Tracking of Resource Types in Timesheets’
- Defect fix re: When entering markup % over 100 percent, Whoops alert.
- Defect fix re: Issues importing a WBS update from Excel.
- Billing Types are imported on Areas and Phases
- The Effective Date of the Billing Rate Table is a date and time.
- Billing Rate Table are not being updated with the Billing Rate Table name and effective date are the same.
- Update to the extend the WBS Is Active/Inactive setting on the Workpackage to Procurement.
- Updated the WBS Summary Alert Message has been renamed from "Estimate" to "Budget"
- Performance optimization on the WBS Add/Update workflows.
- Added validation controls for the Progressing Method in the WBS Import.
- Added Audit History (Project or Administration) record when the Baseline Start/Finish Date when updated through the WBS.
5. CBS
- Defect fix re: Whoops Alert when there are duplicate Cost Codes in the file.
- Update: The alert 'No Saved Cost Code Strings', has been disabled. Instead, the customer will be provided with an email.
- Update: Renamed "Estimate" to "Budget" in the Project CBS Synchronize Message.
6. Billing
- Updated field 'Billing Method' to 'Display Transaction by"
- Update Billing AR > PDF Backup > Individual Transactions to include additional fields:
- - Resource Type
- - Purchase Order #
- - Vendor
- - Vendor Invoice #
- Added fields to Payment Tab and Invoice Tab:
- Created By
- Created On
- Entered By
- Entered On
- Submitted By
- Submitted On
- Updated the Text Filter used in the Invoice Summary grid columns "Approval Due" and "Approved On."
- Defect fix re: When applying Surcharge or Discount by Resource Type to Expenses, it is not applying to Expenses.
- Added Employee ID column to the Billing Transaction Details grid.
- Extended Billing Transactions 'Cost' and add 'Third Party Markup%.
- Relabeled 'Billing AR' to 'Billing' in User Permissions.
- Performance Optimization to Billing Transactions PDF Reports.
- Defect fix re: Whoops Alert appears when creating an Adjustment from Billing.
- Defect fix re: Whoops Alert while saving a Billing Invoice with an invalid billing method; updated alert received.
7. Change Management
- Renamed 'Estimates' to 'Budget'
- Defect fix re: Whoops Errors when reports are exported from Change Order Summary grid > Purchase Order Committed Total hyperlink > To Excel.
- Defect fix re: Change Order – Workpackage Level Estimated Revenue Value Clears on Recalculate Estimate and Save.
- Defect fix re: The Change Order Markup% is divided by 100 when the Billing Type is updated to Cost Plus or Fixed Price after Save and Close.
- Remove the "Project Status Header" in the Change Order Summary Report export to Excel.
- Optimize Change Order Commit
8. Reports .
- Quick Reports
- Align the Project Summary Report - Resource Level (Cost) Report to the Progress Measurement.
- Added the Time-Phasing Report into Quick Reports.
- Updated the Project Productivity Report (Billable) to use new project time phasing settings.
- Updated Project Summary Report > Summary > To PDF Report to use new project time phasing settings.
- Updated the Project Summary Report > Summary to use new project time phasing settings.
- The Time-phased Report (Resources) added Resources and a new tab for Hours.
- The Time-Phased Report to use new project time phasing settings.
- The Time-phased Report (Resources) to use new project time phasing settings.
- USABILITY: Defect fix re: When the Project is Cost Only, there should be no Project Summary Report (Resource - Billable).
- Timeline
- Updated the Project Spend Forecast to use new project time phasing settings.
- Updated the Earned Value S Curve (Project & Labor) to use new project time phasing settings.
- Updated the Estimated Cost and Revenue Timeline Report to use new project time phasing settings.
- Updated fading alert message in the Project Productivity Report (Billable).
9. Change Management
- Renamed 'Estimates' to 'Budget'
- Defect fix re: Whoops Errors when reports are exported from Change Order Summary grid > Purchase Order Committed Total hyperlink > To Excel.
- Defect fix re: Change Order – Workpackage Level Estimated Revenue Value Clears on Recalculate Estimate and Save.
- Defect fix re: The Change Order Markup% is divided by 100 when the Billing Type is updated to Cost Plus or Fixed Price after Save and Close.
- Remove the "Project Status Header" in the Change Order Summary Report export to Excel.
Budget, Budget Revisions, forecast & Progress Measurements
1. Estimates renamed to Budgets
- Updated the Budget Cost Rate and Billing Rate rounding to have the same behavior.
- Added the Baseline Budget Curves to S-Curves (Cost, Revenue, Labor Hours).
- Feature enhancement Import Time-Phasing by Workpackage
- Feature enhancement Import Time-Phasing by Resource Class / Resource
- Updated the Workpackage and Resource Estimate Time-phasing User Interface
- Update: Renamed the "Estimate Report" to "Budget Report" in Quick Reports.
2. Forecasts & Progress Measurements
- New Import templates for Time-Phasing by Workpackage and Time-Phasing by Workpackage/Resource.
- Updated the Forecast To Complete calculation when the Current Budget is Negative; Current budget - Actuals.
- Update in the Baseline Budget columns, "Estimate Hours" has been changed to "Current Hours."
- Defect fix re: FAC value is incorrect when Progress Method is Earned as Planned.
- Defect fix re: Rules of Credit reflecting 'master' settings in Configuration and not the Project WBS settings.
- Defect fix re: The Change Order 'Current Budget' & 'Fully Committed Budget' alert is not reflecting the Fully Committed Budget for each cost code for the entire project.
- Added Workpackage Spend Forecast Report in Progressing.
- Feature enhancement In Progressing, create Time-phasing by Resource Import File Template.
- Updates to existing Time phase Reports.
- Added Workpackage Import File Templated by Time-phasing in Progress Measurement.
- Performance Optimization - Removed progress measurement recalculation Requests from some reports.
- Added a 'Resource Forecast?' column to the Progressing Tab when a Progress Measurement is submitted.
- Added Vendor Item Description and Vendor Invoice Number to the Progressing > Actual Cost hyperlink
- Added Actual Revenue hyperlink drill down report.
3. Reports
- Defect fix re: Current Hours are not included when exporting the Progress Quick Report to Excel.
- Defect fix re: The Estimate To Complete (ETC) - Revenue" on a Fixed Price Project using the Earned as Planned Progress Method does not have the expected result.
- Update to "Estimate To Complete (ETC) - Revenue" specific to Rollups for Time and Material and Cost-Plus Project.
4. Baseline
- Updated: When a Budget is Baseline that has no actual cost and no progress, then the Budget Assumes CPI of 1.
5. Timeline Curves
- Progress Measurement Bar – Cut-Off Date View – The Progress Measurement Bar now functions as a Cut-Off Date View, offering a clearer snapshot of project status as of a specific date.
- Visualize progress up to the selected cut-off date for more accurate reporting and analysis.
- Zoom In/Out Functionality – Zoom controls have been added for improved chart navigation.
- Hold the Shift key and scroll forward to zoom in, or scroll backward to zoom out.
- Enables detailed analysis of specific time periods within the chart.
- Period Chart – Change Date Intervals – You can now adjust the time interval displayed in the Period Chart.
- View data by:
• Daily
• Monthly
• Quarterly
• Yearly
- View data by:
- Export to Excel – Easily export data from reports and charts to Excel for further analysis and sharing.
- Change Marker Symbols – Customize marker symbols in charts for better visual clarity.
- Choose from a variety of shapes (e.g., circles, squares, triangles).
- Apply distinct markers to differentiate data series or milestones.
Procurement
1. Dashboard
- Defect fix re: Dropdown field column filters in multiple Procurement grids are not working as expected.
2. Requisitions
- Defect fix re: Expedite? Selection is not importing through the Requisition Import.
- Defect fix re: The Requisitions (Status column) causing Whoops Alert when clicking the Complete hyperlink.
- Update character limit and update alert with standard max character reached alert on Procurement Item custom fields.
- Defect fix re: The Requisitions Details Line # is not sorting in numerical sequence.
- Update: User can add Budget - Purchasing Requisition items to the existing Requisition.
- Added the ability to import a Requisition by WBS.
- Defect fix re: Column Selection in Requisition Summary grid is not sticky
3. RFQ
- Updated Issue to Selected Vendors > Ratings column to provide a numeric filter
- Defect fix re: Criteria that has been Saved with data in Line Item is removed when Criteria is made inactive
- Defect fix re: Request For Quote can be issued without selecting Items.
- Defect fix re: RFQ Discussion Streams Excel Report date is off by one day when differing time zones from Project Time zone.
- Defect fix re: The Detail Items Export To Excel Report should columns do not match the User Interface.
- Updated the workflow when dates are input into the RFQ Scheduled dates fields, those dates are reflected in the Forecasted fields.
- Added Vendor Custom Fields to the RFQ Issue to Vendor > Vendor Selection Grid.
- Added a filter on the RFQ Item grid Unit Cost and Total Cost column.
4. Bid Analysis & Award
- Performance optimization in the Bid > Award workflow.
5. Purchase Orders and Subcontracts
- Defect fix re: column filtering does not work for dropdown fields
- Updated consistency in Unit Cost and Cost Amount rounding between the Revision Actions.
- Defect Fix when the Revision Action is Incremental Quantity Unit Cost Revision and Incremental Quantity Revision; update the Cost Amount before Save.
- Defect fix re: When selecting the default Invoice To Address for a Project, the Invoice To is not populating with the default address when creating a new Purchase Order.
- Defect fix re Users cannot change the Incremental Qty and Unit Cost without a save in between.
- Defect fix re: The Purchase Order Item Allocation Grid Excel report fails to launch when no Purchase Order is selected.
- Defect fix re: The Inconsistent display of Committed Project Tax and Purchase Order Commitment Net when in Revising.
- Performance Optimization on the Purchase Order Summary grid.
- Defect fix re: The Receipt for Subcontract T&M - Qty and Total Cost fields are not populating.
- Update: When the Markup? or Markup% is changed, record the Before value, after value, and the User who changed the Markup? and Markup % and Date and time in the backend.
- Updated to allow the Vendor Item Description to be edited.
- Update to Purchase Order, Shipping section: add the ability to update shipping information on revision.
- Added Vendor Custom Fields
- Added a check on save when a line item is zero.
- Defect fix: Uncommitting a PO Revision should not zero out the committed tax data
6. Purchase Order Import
- Added Purchase Order # into Import error alert
- Updated Revision Import to allow for update of Cost Code
- Defect fix re: Alert prompted when trying to open the Purchase Order Import Sample file.
- Add the ability to import Requisitions and Purchase Orders by WBS.
- Added the 'Vendor Portal Purchase Order Form’ to the Purchase Order Import.
- Defect fix re: The Purchase Order Revision import (Subcontract T&M) fails because of Contract validation; alert update to ignore change in Contract
7. Expediting:
- Defect fix re: Expediting > Update Details is not updating Heavy Lift field
- Defect fix re: The Custom Procurement field of "Checkbox" type is cleared out on import.
- Defect fix re: Import should fail when mandatory custom dropdown fields are missing.
- Defect fix re: 'Lead Time (Days ARO) Forecasted' field uses DAYS instead of WORKDAYS in calculation
- Update to the Expediting Detail Report. When “Display on Expediting report” is deselected, it will not report on the Expediting Detail report.
- Defect fix re: The Uploaded on Data for Documents is calculating based on UTC not the Project Time zone.
- Defect fix re: Expediting Detail Report Fields aligned to the values reported on the User Interface.
- Updated Procurement > Expediting> Items Lead Time calculations to use new project time phasing settings.
- Updated Procurement > Expediting > Reports > Expediting Detail Report to use new project time phasing settings.
- Updated Procurement > Expediting > Reports > Expediting Summary Status Report to use new project time phasing settings.
- Updated Procurement > Expediting > Reports > Mangan Materials / Expediting Status Report to use new project time phasing settings.
8. Receiving:
- Defect fix re: Receipt amount rounding difference when Receipt is Submitted
- Updated the import error message when the Purchase Order column is empty. A Purchase Order Number is required for a Line Item Receipt.
- Added the 'Purchase Order Title' in the Receiving> Purchase Order Selection grid.
- Update the Receiving Holdback value rounding behavior.
- Performance optimizations improving load time in Receiving.
- In Procurement Receiving > PO Receipts, added the to import by Amount, Quantity and Amount, as well as import as Submitted.
- Defect fix re: Error message alert when receiving amounts on the line items for a deselected Purchase Order.
9. Reports:
- Defect fix re: Procurement Report CCY symbols for Base CCY amounts should display the appropriate CCY symbol.
- Procurement Dashboard
- Added Vendor Custom Fields
- Optimized performance of the Procurement Dashboard Receiving Report.
- Summary Purchasing Report
- Added Vendor Custom Fields
- Added Update button to the Procurement Dashboard Summary Purchasing Report.
- Update Filter behavior for Revisions.
- Defect fix re: The Actual Manhours from the Direct Invoice are not in the Summary Purchasing Report.
- Updated the Purchase Order Summary Report 'Notes' to 'Buyers Comments.'
- Purchase Order Item Detail Report
- Update to Purchase Order Item Detail Report to include Total Paid (Purchase Order CCY) and Total Paid (Base CCY)
- Update the Purchase Order Item Detail Report End Date behavior to be a cut off for Committed, Incurred, Accrued, Invoice Amount and Quantities.
- Defect re: Construction Workpackage and Required At Site data do not match same data in Requisitions screen.
- Add fields:
- Resource Type
- Resource Class
- Resource Class Category
- Vendor Invoice Number(s)
- Vendor Invoice Date(s)
- Last Vendor Invoice Date
- Vendor Invoice Payment Number (s)
- Vendor Invoice Payment Date(s)
- Last Vendor Payment Date
- Responsible Engineer
- Purchase Order Progress/ Status
- Item Date
- Item Revision Date
- Performance Optimization on the Purchase Order Item Detail Report load time.
- USABILITY: Purchase Order Item Details Report: CCY symbol for Purchase Order CCY amounts should display the appropriate CCY symbol instead of the Base CCY symbol.
- Cash Flow
- Added fields to Purchase Order Cash Flow & Spend Forecast Reports.
- Purchase Order Title
- Status
- Updated the Purchase Orders > Reports > Cash Flow to use new project time phasing settings.
- Added fields to Purchase Order Cash Flow & Spend Forecast Reports.
11. Vendor Portal
- Defect fix re: Progress Type dropdown is not filtering correctly for 'Issued" Purchase Orders and RFQ’s.
- Added Vendor Portal Vendor E- Signature Acceptance workflow.
- Added Vendor E-signature to PO Form
12. Purchase Order Form Designer
- Updated Purchase Order Form Designer for Item Level Tax overrides. (Keystone)
- Added Vendor Wet signature when PO is non-Portal to PO Form
- Updated the Purchase Order Form Titles to be bold; Delivery Date (Scheduled) and Tag Number.
Jobsite Timesheet
1. Design, Controls, and Usability
- Defect fix re: The Jobsite Daily Log (Percent field): should not be divided after the Jobsite Timesheet is submitted.
2. Timesheet
- Defect fix re: column filtering does not work for dropdown fields.
- Updated the 'Work Date' column filter in Reports > Jobsite Timesheet to use Data Filtering for improved accuracy and usability.
- Performance Optimization Jobsite Timesheet Submit for Approval.
- Updated Jobsite Timesheet import into Cost Workpackage if there is a Billable Comment the user will receive a warning that the comment will be ignored.
- Defect fix re: The close button is not working in Change Workpackage pop-up window.
- Defect fix re: When the Transmittal is rejected by the customer, it is not re-opened for the Jobsite user.
- Updated the data storage for Timesheets and Adjustments to include Employee ID.
- Defect fix re: Mandatory Labor Custom Field for Jobsite values are being validated.
- Defect fix re: When Labor Custom Fields are enabled for Jobsite, the Values are not displayed in Jobsite.
- Performance Optimization to reduce deadlocks when saving a Jobsite Timesheet that includes surcharges or discounts with Timesheet Entry timings.
- Defect fix re: The Package # is not populating in the Jobsite Timesheet > Progress tab when the Progressing Method is Rule of Credit Weighted Type.
- Update Discount and Surcharge behavior to align with Weekly Timesheets when Discounts & Surcharges Incur option selection is ‘Timesheets.’
Timesheets
- Defect fix re: The Receiving Delete action is failing when there's a Document upload from the Library.
1. Equipment Timesheet
- Added Equipment ID added to Equipment Transactions Quick Report.
2. Import
- Updated Third Party Expenses import to provide more details on data that fails the Max Daily Quantity validation
- Projects - Import Transactions - LEM: add required marker [ *] into sample-file for Equipment ID.
Approvals and Vendor Invoice Matching & Administration
1. Approvals:
- Updated the Approval workflow with multiple stages to remove the Approval from ‘Waiting for my Approval’ after it has been approved.
- Performance Optimization to the Approvals loading time.
- Labor Timesheets:
- Defect fix re: Cannot change the "From Date" filter; updated the page to load with paging.
- Customer Invoices
- Removed fading alert re: Unapproved Timesheets
- Purchase Orders
- Update the display of Committed Project Tax and Purchase Order Commitment Net in Approvals.
- Defect Fix in Approvals> Purchase Order> Waiting/My Submissions/All Submissions> Group Totals and Grand Totals are incorrect when there are Revisions
- Defect fix re: The My Approval Details Item tab is not displaying Documents uploaded to the Line Items.
- Defect fix re: The Purchase Order Approval Line items do not appear the first time the Purchase Order is selected.
- Add Procurement item Custom Fields marked as Active to the Purchase Order Approval > Waiting for my Approval > lower grid > details.
- Vendor Invoices
- Added Update Button to Vendor Invoices.
- Defect fix re: Breaks in Approval History tab when running Status Reports.
- USABILITY: Updated the message when Rejecting Vendor Invoices that have a released Holdback in Waiting for My Approvals.
2. Administration
- Timesheet Administration
- Add Equipment ID column to the Timesheet Administration > Equipment View.
- Vendor Invoice Matching
- Defect fix re: In the Vendor Invoice Matching Tracking> New Invoice - The Vendor Address Field is missing when PO CCY <> Base CCY.
- Vendor Invoice Matching > Invoice Tracking:
- Updated the Vendor Invoice Matching Delete Vendor Invoice Alert from Retainage to Holdback.
- Vendor Accruals (Vendor Tracking):
- Add Columns to Vendor Invoice Report; Project, Vendor Code and Purchase Order.
- Update: Improved Alert Message when trying to delete a labor expense that was added to a vendor invoice.
- Add an alert when uploading Vendor Invoice documents with the same file name, on the same Vendor Invoice.
- Updates Vendor Invoice Matching > Vendor Invoices > Reports > Vendor Invoice Report; Vendor Filter and grouped by Vendor Invoice
- Vendor Invoice Matching > Direct To Invoice
- Update Direct to Invoice import to allow Vendor Invoice Dates prior to Transaction Dates
- Defect fix re: The Payment Terms Override Details no longer displayed after Save when creating a New Direct to Invoice Vendor Invoice.
- Vendor Invoice Matching > Holdback Release
- Defect re: Holdback Release can be entered prior to the holdback transactions date
- Defect fix re: The Payment Terms Override Details no longer displayed after Save when creating a New Holdback Release Invoice.
- Defect fix re: Uploading Holdback Release - Direct Invoice documents not loading.
3. Adjustments:
- Updated Quantity filter to numeric in Transactions grid
- Added an Alert has been added to notify the user when the data range requested is too large.
- Removed Progress Billable as transaction is available in Adjustment.
- Removed the Tag Number field column.
- Updated the Add New Transaction, replace the Tag Number with Equipment ID and populate the same column with correct data.
- Updated the Adjustment Report for Billing, change the column name from Tag Number to Equipment ID in both UI and Excel.
- Updated the Adjustment Items column name from Tag Number to Equipment ID in both UI and Excel
- Update the Qty filter for the Adjust transaction selection grid to be numeric.
- Update the Qty filter for the Adjust Entries grid to be numeric.
- Defect fix re: The Delete Adjustment Document is failing when including a ‘New’ Adjustment Document.
Project Reporting
1. Project Manager’s Dashboard
- Defect fix re: clicking on X in the date selection window disables the buttons in Dashboard Reports
2. Project Dashboard:
- Optimized Project Hours By Resource Class chart
3. Project Details Report:
- Updated Resource Type field value from 'LaborExpense' to 'Labor Expense'
- Defect fix re: column filtering does not work for dropdown fields
- Defect fix re: Associated Discounts/Surcharges are still showing when running Project Details Report, even when the transaction is removed from the Customer Invoice.
- Update: Surcharges and discounts should not be generated for procurement unless explicitly selected in the Billing workflow.
- Defect fix re: Discounts & Surcharge are displaying even when the Receipt Transactions are removed from the Customer Invoice.
- Defect fix re: Report Options are lock after closing the options window using the close button.
- Update to Project Dashboard Details report re: 'Progress Billable' rate type.
- Defect fix re: There are two 'Jobsite Package Number' columns.
4. Project Summary Report:
- Defect fix re: Before Progress Measurement creation, Confirmed Costs are being reported without an associated Invoice.
- Update to Quick Reports removing Progressing Method column on Areas and Phases
5. Timeline Charts
- Updated the Project Spend Forecast to use new project time phasing settings.
- Updated the Earned Value S Curve (Project & Labor) to use new project time phasing settings.
- Updated the Estimated Cost and Revenue Timeline Report to use new project time phasing settings.
- Update Actual Cost and Revenue Timeline report for Fixed Price Projects.
- Updated fading alert message in the Project Productivity Report (Billable).
6. Quick Reports
- Align the Project Summary Report - Resource Level (Cost) Report to the Progress Measurement.
- Added the Time-Phasing Report into Quick Reports.
- Updated the Project Productivity Report (Billable) to use new project time phasing settings.
- Updated Project Summary Report > Summary > To PDF Report to use new project time phasing settings.
- Updated the Project Summary Report > Summary to use new project time phasing settings.
- The Time-phased Report (Resources) added Resources and a new tab for Hours.
- The Time-Phased Report to use new project time phasing settings.
- The Time-phased Report (Resources) to use new project time phasing settings.
- USABILITY: Defect fix re: When the Project is Cost Only, there should be no Project Summary Report (Resource - Billable).
Custom Reports
1. Custom Reports
- Added User Interface 10,000-line Row limit disclaimer for Custom Dashboard project and Global reports.
2. Dashboard > Project > All Procurement Items
- Added Vendor Custom Fields
- Defect fix re: The Receipt Resolved Date format shows as a number in Excel reports updated to date.
- Added Receipt OS&D, Receipt Resolved, and Condition fields to the Procurement custom reporting datasets.
3. Dashboard > Global > Project > All Procurement Items
- Added Vendor Custom Fields
- Defect fix re: The Receipt Resolved Date format shows as a number in Excel reports, updated to date.
- Added Receipt OS&D, Receipt Resolved, and Condition fields to the Procurement custom reporting datasets.
4. Templated > Global > All Procurement Items
- Optimization of the Custom Templated > Global > All Procurement Item dataset.
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports
- Added Vendor Custom Fields
- Added Receipt OS&D, Receipt Resolved, and Condition fields to the Procurement custom reporting datasets.
- Optimized the query in the Custom Templated report and WBS.
- Updated Custom Dashboard Report > Global > All Procurement Items to use new project time phasing settings.
- Update Custom Templated Report > Global > All Procurement Items to use new project time phasing settings
5. Templated > Project > All Procurement Items
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports
- Added Vendor Custom Fields
- Added Receipt OS&D, Receipt Resolved, and Condition fields to the Procurement custom reporting datasets.
- Optimized the query in the Custom Templated report and WBS.
- Updated Custom Templated Report > Project > All Procurement Items to use new project time phasing settings.
- Defect fix re: The Shipping Date values are missing from the report.
- Defect fix re: The All Procurement Items: Delivery Date (Forecasted) value is not always shown in the report.
6. Templated > Project > Purchase Order Items
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports
- Defect fix re: When a Purchase Order Revision is not committed, the Item Committed Total Revenue Amount (BASE CCY) populates not as expected.
- Added Receipt OS&D, Receipt Resolved, and Condition fields to the Procurement custom reporting datasets.
- Optimized the query in the Custom Templated report and WBS.
- Added WBS to Custom Templated, Procurement, Purchase Order Item data set.
7. Templated > Project > Projects > Billing Transactions
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports
8. Templated > Project > Projects > Project Summary & Detail
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports
9. Dashboard > Global > All Projects Summary
- Update Custom Dashboard and Templated Report > Global > All Project Summary to use new project time phasing settings.
10. Templated > Global > All Projects Details
- Improved alert received when user provides format other than .xlsx for Templated Custom Reports.
Business Intelligence Reporting
1. Project Reports
- Performance optimization improving the run time to generate Business Intelligence reports.
- Updates to Business Intelligence > Project Reports > Project Spend Financials to use new project time phasing settings
- Cost Code Report
- Performance Optimization: Added an Update button to the Cost Code Report UI.
- Performance: Optimize Business Intelligence Cost Code Report.
- Updates to the Business Intelligence Cost Code Report.
- All Project Summary Cost
- Performance Optimization to the Project Productivity Reports.
- Added Workpackage & Resource Class tab in Manpower Loading Report
- Updated Business Intelligence > Project Reports > All Project Summary (Cost) > Manpower Loading Report to use new project time phasing settings.
- Updated Business Intelligence > Project Reports > All Project Summary (Cost) > Summary by Resource Type Report to use new project time phasing settings.
- Updated Business Intelligence > Project Reports > All Project Summary (Cost) > Project Spend Forecast to use new project time phasing settings.
- Updated Business Intelligence > Project Reports > All Project Summary (Cost/Billable) > Manpower Loading Report to use new project time phasing settings.
- Update the All-Projects Summary (Cost) Titles in the UI and Excel report to align.
- All Project Summary Billable
- Performance Optimization to the Project Productivity Reports
- Updated Business Intelligence > Project Reports > All Project Summary (Billable) > Reports > Revenue Forecast to use new project time phasing settings.
- Updated Business Intelligence > Project Reports > All Project Summary (Billable) to use new project time phasing settings.
- Updated Business Intelligence > Project Reports > All Project Summary (Cost/Billable) > Manpower Loading Report to use new project time phasing settings.
- All Project Details
- Defect fix re: Excel Report does not reflect Resource Name when grouped by Resource Name
- Defect fix re: The Entry Type and Custom Project Field Filters do not display dropdown values in the UI.
- Added the Cost Value Pre-Tax to the Excel Report.
2. Procurement Reports
- Summary Purchasing Report
- Defect fix re: Missing columns when exporting the Detail Purchasing Report to Excel.
- Defect fix re: In the Summary Purchase Report, the Transaction Summary grid is not showing data when R1 is in Revising.
- RFQ Status Report
- Added 'Total Amount' in RFQ Status Report.
3. Resource Reports
- Labor Summary Report
- Updates to the Grand Total percentage values in the Labor Summary Report.
- Labor Time Report
- Updates to the Labor Time Reports for Cost and Billable view permissions
- Add the ability to adjust the column widths.
4. Equipment Report
- Add the Utilization column to the Business Intelligence > Resource Reports > Equipment Report > Summary with Maintenance > Detail Excel report.
5. Finance and HR Reports
- HR Reports
- Update Business Intelligence > Finance/HR Reports > HR Report to use new project time phasing settings.
- Payroll Management
- Updated the Employee Identifier field in reports to 'Employee ID.'
- Export Documents
- Defect fix re: In Export Document> New> All Transactions - Resource Class Category is not populating when Resource Type is not set to Labor.
4CP Connect
- Update Public API > Create Customer Error Message for Customer Contact with the same Email Address.
Platform
Solutions
Owners
Contractors
Engineering/EPCM
Professional Services
Resources
White Papers
Case Studies
Blog
Videos
Frequently Asked Questions
Company
About